TL;DR

This paper proposes a fast neural network screening method to rank power grid contingencies—particularly N-1 and N-2 line outages—by severity, enabling prioritized simulation. Trained on a small fraction of N-1 contingencies, the model achieves near-optimal risk reduction with only 3–4 simulations, cutting computational cost by over 50× compared to current N-1 criteria while maintaining high security by prioritizing dangerous cases first.

ABSTRACT

We address the problem of maintaining high voltage power transmission networks in security at all time. This requires that power flowing through all lines remain below a certain nominal thermal limit above which lines might melt, break or cause other damages. Current practices include enforcing the deterministic "N-1" reliability criterion, namely anticipating exceeding of thermal limit for any eventual single line disconnection (whatever its cause may be) by running a slow, but accurate, physical grid simulator. New conceptual frameworks are calling for a probabilistic risk based security criterion and are in need of new methods to assess the risk. To tackle this difficult assessment, we address in this paper the problem of rapidly ranking higher order contingencies including all pairs of line disconnections, to better prioritize simulations. We present a novel method based on neural networks, which ranks "N-1" and "N-2" contingencies in decreasing order of presumed severity. We demonstrate on a classical benchmark problem that the residual risk of contingencies decreases dramatically compared to considering solely all "N-1" cases, at no additional computational cost. We evaluate that our method scales up to power grids of the size of the French high voltage power grid (over 1000 power lines).

Motivation & Objective

  • To address the computational bottleneck in power grid security assessment by rapidly identifying the most severe contingencies.
  • To reduce reliance on slow, exhaustive simulations by using a fast proxy model to prioritize high-risk events.
  • To improve risk assessment beyond the deterministic N-1 criterion by enabling efficient evaluation of higher-order contingencies (e.g., N-2).
  • To ensure high hit rate for dangerous contingencies while minimizing false alarms, aligning with safety-critical operational priorities.
  • To demonstrate scalability and robustness of the method on real-world power grid benchmarks, including the French EHV grid.

Proposed method

  • Train a feedforward neural network to approximate the output of a physical power flow simulator, predicting line thermal limits under various contingencies.
  • Use the trained network to score each contingency based on how close lines come to thermal limits, serving as a severity proxy.
  • Rank all contingencies in decreasing order of predicted severity to prioritize slow, accurate simulator runs.
  • Apply the method to both single (N-1) and double (N-2) line disconnection scenarios, even when trained only on N-1 data.
  • Use Gini coefficient and residual risk metrics to evaluate ranking performance, with computational cost measured as number of simulations required.
  • Leverage transferability: the model generalizes to unseen contingencies and maintains performance despite distribution shifts between training and test data.

Experimental results

Research questions

  • RQ1Can a fast neural network proxy effectively rank power grid contingencies by severity, outperforming the standard N-1 criterion?
  • RQ2To what extent can a model trained only on N-1 contingencies generalize to identify dangerous N-2 contingencies?
  • RQ3How does the method reduce residual risk while minimizing the number of full simulations required?
  • RQ4What is the trade-off between hit rate and false alarm rate in a safety-critical context, and does the method favor high hit rate?
  • RQ5Can the method scale to large power grids such as the French Extra High Voltage network?

Key findings

  • The neural network method achieved a residual risk of 0.44 (R*) with only 3 simulations on average, outperforming the current TSO operator strategy and approaching the optimal benchmark.
  • The method reduced computational cost by a factor of over 50 compared to the N-1 policy, requiring only 2% of the simulation budget.
  • Even when trained exclusively on 0.5% of all possible N-1 contingencies, the model outperformed the standard N-1 criterion in risk reduction.
  • The model prioritized dangerous N-1 contingencies first and then ranked the worst N-2 cases, demonstrating strong hit rate and risk-adverse behavior.
  • The method is robust to distribution shifts: performance improved when tested on new, unseen contingencies, as shown in Figure 3.
  • The approach is scalable to large systems, with estimated speedups of over 2,000× for the French EHV power grid.

Read this paper

Open the full text in the Nubint reader and ask about any passage as you read.

Read this paper on Nubint

This review was generated by AI from the original paper. Please check the paper before citing it.