Narsireddy Anugu, N. H. Turner|arXiv (Cornell University)|Feb 17, 2026
Astronomy and Astrophysical ResearchPhysics and Astronomy0 citations
TL;DR

The paper documents a mid-2021 to 2024 upgrade of CHARA's delay lines from a VME-based system to a hybrid FPGA-Linux architecture, analyzes commissioning issues and performance, and outlines future baseline-length and mode enhancements.

ABSTRACT

Long baseline optical and infrared interferometric arrays achieve high angular resolution and enable detailed astrophysical measurements. Interferometers have enabled observations of stars at various stages of evolution, as well as studies of binary stars, circumstellar disks, and active galactic nuclei. The CHARA Array is a long-baseline interferometric array at the Mount Wilson Observatory, USA. At the core of CHARA operations are the delay lines, which equalize the optical path length for all telescopes as the Earth rotates and compensate for optical path variations induced by atmospheric turbulence. We report recent upgrades and performance of the CHARA Array optical delay lines for high-precision interferometric observations. The legacy system had been operational for over two decades, and it was increasingly difficult to acquire replacement parts. Beginning in mid-2021, the control system underwent a major upgrade, replacing the aging VME-based architecture with a modern hybrid FPGA and Linux-based system; this modernization continued through the end of 2024. We describe hardware/software changes, the servo architecture, and lab/on-sky performance. The upgraded system achieves residual delay line cart tracking errors of $\sim12$~nm, the same level as the legacy system, and a control bandwidth of 100-130~Hz, allowing fringe tracking across the R, H, and K bands. Initial commissioning revealed key issues such as metrology time-tick jitter and vibration-induced visibility loss, which were diagnosed and resolved. We note ongoing and future efforts to extend baselines up to 1~km and support advanced observing modes such as dual-field interferometry and nulling. This paper is a reference for current and future use of the CHARA Array and for next-generation instrument design.

Motivation & Objective

  • Summarize the upgrades to the CHARA Array delay-line control system and their motivation.
  • Characterize the post-upgrade performance in laboratory and on-sky tests.
  • Identify commissioning challenges and the mitigations implemented during the transition.
  • Present lessons learned and outline planned future directions for CHARA delay lines and observing modes.

Proposed method

  • Describe the legacy and upgraded delay-line control architectures.
  • Detail the embedded metrology FPGA system and four-layer cascaded servo loops (PZT, VC1, VC2, stepper).
  • Report on metrology-based timing, target generation, and synchronization with the CHARA master clock.
  • Present on-sky and laboratory performance metrics, including residual delays and bandwidth.
  • Discuss commissioning issues and their resolutions with concrete examples and figures.
Figure 1: Top: Overview of the CHARA Array. The six $1\,\mathrm{m}$ telescopes, named S1, S2, W1, W2, E1, and E2, are arranged in a Y-shaped configuration. Vacuum pipes transport starlight from the telescopes to the central beam combiner laboratory. Bottom: Photograph of the delay line system showin
Figure 1: Top: Overview of the CHARA Array. The six $1\,\mathrm{m}$ telescopes, named S1, S2, W1, W2, E1, and E2, are arranged in a Y-shaped configuration. Vacuum pipes transport starlight from the telescopes to the central beam combiner laboratory. Bottom: Photograph of the delay line system showin

Experimental results

Research questions

  • RQ1What performance gains and limitations result from upgrading CHARA delay lines to a hybrid FPGA-Linux system?
  • RQ2Can the upgraded system achieve the required residual delay tracking accuracy and bandwidth to maintain high fringe visibility across R, H, and K bands?
  • RQ3What commissioning issues arise during such a migration, and how can they be mitigated effectively?
  • RQ4What future directions (e.g., baselines up to 1 km, dual-field interferometry, nulling) are feasible with the upgraded infrastructure?

Key findings

  • Residual cart tracking errors post-upgrade are ~12 nm RMS, matching the legacy system performance.
  • Control bandwidth after upgrade is 100–130 Hz, enabling fringe tracking across R, H, and K bands.
  • Initial commissioning revealed metrology time-tick jitter and vibration-induced visibility loss, which were diagnosed and mitigated.
  • Commissioning documented specific fixes such as correcting metrology clock jitter and re-tuning PID gains, improving bandwidth and stability.
  • System supports planned extensions including baselines up to 1 km and advanced observing modes like dual-field interferometry and nulling.
Figure 2: Schematic of the CHARA beam train feeding the SPICA (visible), MIRC-X (near-IR; SPICA-FT), and MYSTIC (near-IR) beam combiners. Only one telescope is shown. In the SPICA+MIRC-X+MYSTIC mode, the telescope dichroic (TelDic) directs 20% of the visible light to the AO/WFS and transmits the rem
Figure 2: Schematic of the CHARA beam train feeding the SPICA (visible), MIRC-X (near-IR; SPICA-FT), and MYSTIC (near-IR) beam combiners. Only one telescope is shown. In the SPICA+MIRC-X+MYSTIC mode, the telescope dichroic (TelDic) directs 20% of the visible light to the AO/WFS and transmits the rem

Read this paper

Open the full text in the Nubint reader and ask about any passage as you read.

Read this paper on Nubint

This review was generated by AI from the original paper. Please check the paper before citing it.