This paper presents the completion of testing 13 double-spoke cavity cryomodules for the European Spallation Source (ESS), marking the first deployment of this cavity type in a real accelerator. The FREIA Laboratory at Uppsala University conducted comprehensive cryogenic, RF, and mechanical tests, identifying and resolving issues such as vacuum leaks in double-wall tubes and stepper motor failures, with all repaired modules successfully retested and accepted.

ABSTRACT

The FREIA Laboratory at Uppsala University, Sweden, has completed the evaluation of 13 double-spoke cavity cryomodules for ESS. This is the first time double-spoke cavities will be deployed in a real machine. This paper summarizes testing procedures and statistics of the results and lessons learned.

Motivation & Objective

  • To validate the performance and reliability of 13 double-spoke cavity cryomodules for the European Spallation Source (ESS) prior to installation.
  • To identify and resolve technical challenges specific to double-spoke cavity cryomodules during series testing.
  • To ensure cryomodule readiness through comprehensive cryogenic, RF, and mechanical testing under real operating conditions.
  • To provide critical feedback to the SRF community on challenges such as multipacting and fast interlock requirements in spoke cavities.
  • To demonstrate successful repair and retesting of cryomodules with identified faults, ensuring no performance degradation post-repair.

Proposed method

  • Conducted site acceptance testing at FREIA Laboratory, including cryogenic cooldown to 2 K using liquid helium and liquid nitrogen thermal shields.
  • Performed RF conditioning of fundamental power couplers (FPCs) at both room and cold temperatures to ensure stable operation.
  • Executed full RF testing of cavities at 2 K, measuring field quality, tuning range, and Lorentz force detuning (LFD) characteristics.
  • Measured static and dynamic heat loads using cold tuning systems (CTS) at target frequency positions.
  • Implemented fast interlock systems for Low-Level RF (LLRF) control and verified their response during testing.
  • Used piezoelectric actuators for active compensation of LFD, with tuning range measured up to 400 Hz per actuator, exceeding required 9 MV/m LFD.
Figure 1 : Testing schedule example for a cryomodule.
Figure 1 : Testing schedule example for a cryomodule.

Experimental results

Research questions

  • RQ1What are the primary failure modes encountered during series testing of double-spoke cavity cryomodules?
  • RQ2How do vacuum leaks in double-wall tubes and stepper motor failures impact cryomodule performance and reliability?
  • RQ3To what extent do RF and mechanical parameters degrade after repair and retesting compared to initial vertical tests?
  • RQ4How effective are piezoelectric actuators in compensating for Lorentz force detuning at 9 MV/m field levels?
  • RQ5What operational and procedural improvements are necessary for efficient, large-scale cryomodule testing in future projects?

Key findings

  • All 13 cryomodules were successfully tested after initial failures, with 5 requiring repairs and all passing retesting after component replacement.
  • Vacuum leaks in the double-wall tubes were only detected during cold testing, not during warm leak checks, highlighting the importance of cold leak testing.
  • Stepper motor failures occurred due to mechanical unresponsiveness after reaching specific positions, with root cause still under investigation.
  • The piezoelectric actuators provided a tuning range exceeding 400 Hz per actuator, which is 20% higher than the required range for 9 MV/m Lorentz force detuning.
  • No significant performance degradation was observed in cavities after repair and retesting compared to pre-assembly vertical test results.
  • The testing campaign revealed unexpected challenges such as multipacting and the critical need for fast interlocks even at low RF fields, providing key insights for future spoke cavity projects.
Figure 2 : Comparison of the FPC conditioning back-to-back with standing and travelling wave (IJCLab) and when assembled in the cryomodule (FREIA).
Figure 2 : Comparison of the FPC conditioning back-to-back with standing and travelling wave (IJCLab) and when assembled in the cryomodule (FREIA).

Read this paper

Open the full text in the Nubint reader and ask about any passage as you read.

Read this paper on Nubint

This review was generated by AI from the original paper. Please check the paper before citing it.