[Paper Review] Connected Coordinated Motion Planning with Bounded Stretch
This paper presents a polynomial-time algorithm for connected coordinated motion planning of robot swarms with bounded stretch, ensuring the swarm remains connected throughout reconfiguration. It achieves a constant-factor approximation of the optimal makespan by leveraging scaled shapes and flow-based coordination, guaranteeing a schedule duration of O(d) when the maximum Manhattan distance between start and target positions is d.
We consider the problem of coordinated motion planning for a swarm of simple, identical robots: From a given start grid configuration of robots, we need to reach a desired target configuration via a sequence of parallel, continuous, collision-free robot motions, such that the set of robots induces a connected grid graph at all integer times. The objective is to minimize the makespan of the motion schedule, i.e., to reach the new configuration in a minimum amount of time. We show that this problem is NP-hard, even for deciding whether a makespan of 2 can be achieved, while it is possible to check in polynomial time whether a makespan of 1 can be achieved. On the algorithmic side, we establish simultaneous constant-factor approximation for two fundamental parameters, by achieving constant stretch for constant scale. Scaled shapes (which arise by increasing all dimensions of a given object by the same multiplicative factor) have been considered in previous seminal work on self-assembly, often with unbounded or logarithmic scale factors; we provide methods for a generalized scale factor, bounded by a constant. Moreover, our algorithm achieves a constant stretch factor: If mapping the start configuration to the target configuration requires a maximum Manhattan distance of d, then the total duration of our overall schedule is 𝒪(d), which is optimal up to constant factors.
Motivation & Objective
- To address the challenge of efficiently reconfiguring a large collective of identical, connected robots from a start to a target grid configuration while maintaining connectivity at all times.
- To minimize the makespan—the total time until all robots reach their target positions—under the constraint of parallel, collision-free motion.
- To provide a constant-factor approximation for the makespan under realistic assumptions, particularly bounded scale factors in the start and target configurations.
- To generalize prior work on self-assembly and scaled shapes by introducing a bounded scale factor, enabling practical applicability to swarm robotics.
Proposed method
- The method uses a flow-based decomposition of robot movements, modeling the reconfiguration as a flow network where supply and demand are defined per tile in a grid partition.
- It partitions each tile into nine sub-tiles and assigns robots to sub-tiles based on target direction, forming clusters near inter-tile boundaries to enable coordinated movement.
- A stable schedule is constructed by simultaneously pushing clusters toward their target tiles using layered, edge-aligned robot arrangements within sub-tiles.
- The algorithm computes a bottleneck matching between start and target configurations to minimize the maximum displacement, ensuring a low initial makespan.
- It applies a minimum bottleneck matching in O(n^1.5 log n) time to align start and target configurations with minimal displacement.
- The final schedule ensures connectivity by maintaining robot clusters at tile interfaces and using synchronized, parallel motion steps.
Experimental results
Research questions
- RQ1Is connected coordinated motion planning with bounded stretch NP-complete, even for small makespans like 2?
- RQ2Can a constant-factor approximation of the optimal makespan be achieved under bounded scale factors for start and target configurations?
- RQ3Is it possible to achieve a schedule with stretch O(d) when the maximum Manhattan distance between start and target positions is d?
- RQ4How can connectivity be preserved during parallel robot reconfiguration without relying on unbounded scale factors?
- RQ5Can the algorithm be extended to cases where start and target configurations do not overlap?
Key findings
- The problem of connected coordinated motion planning with bounded stretch is NP-complete, even for deciding whether a makespan of 2 is achievable.
- A polynomial-time algorithm achieves a makespan of O(d) for any start-to-target displacement d, which is optimal up to constant factors.
- The algorithm guarantees constant stretch: if the maximum Manhattan distance is d, the total schedule duration is O(d), independent of swarm size.
- The method works under a generalized bounded scale factor, extending prior work that assumed unbounded or logarithmic scale.
- For non-overlapping start and target configurations, the algorithm computes a bottleneck matching to align them within O(d) makespan, preserving the constant stretch property.
- The algorithm achieves a constant-factor approximation for minimal makespan, provided the scale factor of both configurations is at least a universal constant c*.
Read this paper
Open the full text in the Nubint reader and ask about any passage as you read.
Read this paper on NubintThis review was generated by AI from the original paper. Please check the paper before citing it.