Skip to main content
QUICK REVIEW

[Paper Review] Diameters of Permutation Groups on Graphs and Linear Time Feasibility Test of Pebble Motion Problems

Jingjin Yu|arXiv (Cornell University)|May 23, 2012
Optimization and Search ProblemsComputer Science12 references3 citations
TL;DR

This paper introduces a novel formulation of the pebble motion problem on graphs that allows synchronous rotations of pebbles along fully occupied cycles, proving that the diameter of the resulting permutation group is O(n²). It presents a linear-time algorithm to determine reachability between any two configurations, resolving an open problem in the field.

ABSTRACT

Let $G$ be an $n$-vertex connected, undirected, simple graph. The vertices of $G$ are populated with $n$ uniquely labeled pebbles, one on each vertex. Allowing pebbles on cycles of $G$ to rotate (synchronous rotations along multiple disjoint cycles are permitted), the resulting pebble permutations form a group $\G$ uniquely determined by $G$. Let the diameter of $\G$ (denoted $diam(\G)$) represent the length of the longest product of generators (cyclic pebble rotations) required to reach an element of $\G$, we show that $diam(\G) = O(n^2)$. Extending the formulation to allow $p \le n$ pebbles on an $n$-vertex graph, we obtain a variation of the (classic) pebble motion problem (first fully described in Kornhauser, Miller, and Spirakis, 1984) that also allows rotations of pebbles along a fully occupied cycle. For our formulation as well as the (classic) pebble motion problem, given any start and goal pebble configurations, we provide a linear time algorithm that decides whether the goal configuration is reachable from the start configuration. This gives a positive answer to an open problem raised by (Auletta et al., 1999)

Motivation & Objective

  • To extend the classic pebble motion problem by allowing synchronous rotations of pebbles along fully occupied cycles in a graph.
  • To analyze the diameter of the permutation group generated by such cyclic rotations on an n-vertex graph.
  • To develop a linear-time algorithm for determining whether a target pebble configuration is reachable from a start configuration under the new rules.
  • To resolve an open problem posed by Auletta et al. (1999) concerning the feasibility of linear-time reachability testing in this extended model.

Proposed method

  • Model the graph as a connected, undirected, simple graph with n vertices and n uniquely labeled pebbles, one per vertex.
  • Define the group G as the set of all permutations generated by synchronous rotations along disjoint cycles in the graph.
  • Analyze the group structure to bound the diameter of G, showing it is O(n²) using combinatorial arguments on cycle decompositions.
  • Extend the model to allow p ≤ n pebbles on an n-vertex graph, preserving the ability to rotate pebbles along fully occupied cycles.
  • Design a reachability algorithm based on graph traversal and cycle decomposition that runs in linear time relative to the number of vertices.
  • Prove correctness and optimality of the algorithm by leveraging group-theoretic properties and structural invariants of the graph and pebble configurations.

Experimental results

Research questions

  • RQ1What is the maximum number of cyclic rotation operations required to generate any permutation in the group G formed by pebble rotations on a connected graph?
  • RQ2Can the reachability of a target pebble configuration from a start configuration be decided in linear time under the extended model allowing cycle rotations?
  • RQ3How does the inclusion of synchronous rotations along fully occupied cycles affect the group structure and diameter of the permutation group?
  • RQ4Is there a polynomial-time (specifically linear-time) algorithm for solving the feasibility problem in this generalized pebble motion model?
  • RQ5Does the extended model preserve the structural properties needed for efficient reachability computation, compared to the classic pebble motion problem?

Key findings

  • The diameter of the permutation group G generated by cyclic pebble rotations on an n-vertex graph is bounded by O(n²).
  • A linear-time algorithm exists for determining whether a goal configuration is reachable from a start configuration in the extended pebble motion model.
  • The algorithm efficiently handles both the classic pebble motion problem and its extension with cycle rotations, maintaining linear time complexity.
  • The solution resolves an open problem posed by Auletta et al. (1999) regarding the feasibility of linear-time reachability testing in this context.
  • The group structure induced by synchronous cycle rotations is sufficiently constrained to allow efficient computation of reachability and bounds on group diameter.

Read this paper

Open the full text in the Nubint reader and ask about any passage as you read.

Read this paper on Nubint

This review was generated by AI from the original paper. Please check the paper before citing it.