Skip to main content
QUICK REVIEW

[Paper Review] Explaining Cost Overruns of Large-Scale Transportation Infrastructure Projects using a Signalling Game

Chantal C. Cantarelli, Caspar Chorus|RePEc: Research Papers in Economics|Jul 8, 2013
Auction Theory and ApplicationsDecision Sciences5 citations
TL;DR

This paper uses a signaling game model to explain cost overruns in large-scale transportation infrastructure projects as a result of asymmetric information and strategic behavior between principals (e.g., governments) and agents (e.g., contractors). It demonstrates that when agents send misleading signals about project costs, principals cannot accurately assess their true type, leading to overruns—while accountability structures and benchmarking can mitigate this by improving signal credibility and reducing information asymmetry.

ABSTRACT

Strategic behaviour is one of the main explanations for cost overruns. It can theoretically be supported by agency theory, in which strategic behaviour is the result of asymmetric information between the principal and agent. This paper gives a formal account of this relation by a signalling game. This is a game with incomplete information which considers the way in which parties anticipate upon other parties' behaviour in choosing a course of action. The game shows how cost overruns are the result of an inappropriate signal. This makes it impossible for the principal to distinguish between the types of agents, and hence, allows for strategic behaviour. It is illustrated how cost overruns can be avoided by means of two policy measures, e.g. an accountability structure and benchmarking.

Motivation & Objective

  • To explain why large-scale transportation infrastructure projects frequently experience cost overruns despite rigorous planning.
  • To analyze how strategic behavior by project agents—driven by asymmetric information—contributes to these overruns.
  • To formalize the principal-agent relationship in infrastructure projects using game-theoretic modeling.
  • To identify policy mechanisms that can reduce cost overruns by improving information transparency and credibility.
  • To demonstrate how accountability structures and benchmarking can correct signaling inefficiencies in project procurement.

Proposed method

  • Formalizes the principal-agent relationship in infrastructure projects as a signaling game with incomplete information.
  • Models agents as having private information about project costs and types (e.g., high-cost vs. low-cost contractors).
  • Analyzes equilibrium outcomes where agents may strategically signal lower costs to win contracts.
  • Introduces two policy interventions: an accountability structure and benchmarking to improve signal credibility.
  • Uses game-theoretic equilibrium analysis (e.g., separating and pooling equilibria) to evaluate how policy changes affect signaling behavior.
  • Applies the model to real-world infrastructure projects to illustrate how asymmetric information leads to cost overruns.

Experimental results

Research questions

  • RQ1How does asymmetric information between principals and agents lead to cost overruns in large infrastructure projects?
  • RQ2What role does strategic signaling by agents play in distorting project cost estimates?
  • RQ3Under what conditions do pooling equilibria emerge, leading to inefficient project outcomes?
  • RQ4How can accountability structures reduce the incentives for agents to misrepresent project costs?
  • RQ5To what extent can benchmarking improve the credibility of cost signals and reduce overruns?

Key findings

  • Cost overruns arise when agents with high-cost types send misleading signals to appear as low-cost types, exploiting information asymmetry.
  • In the absence of credible signals, principals cannot distinguish between high- and low-cost agents, leading to inefficient project selection.
  • A pooling equilibrium—where both types of agents send the same signal—results in higher expected costs and overruns.
  • An accountability structure reduces the incentive for strategic overstatement by linking future performance to reputation and penalties.
  • Benchmarking improves signal credibility by comparing project costs to similar past projects, reducing uncertainty for principals.
  • The combination of accountability and benchmarking can lead to a separating equilibrium where types are distinguishable, minimizing overruns.

Read this paper

Open the full text in the Nubint reader and ask about any passage as you read.

Read this paper on Nubint

This review was generated by AI from the original paper. Please check the paper before citing it.