[Paper Review] FNAL PIP-II Accumulator Ring
This paper proposes the design and construction of a 0.8 GeV (upgradable to 1+ GeV) permanent magnet-based accumulator ring (PAR) in the PIP-II Booster Transfer Line area at Fermilab to enable high-intensity proton beam injection into the Booster for future high-power neutrino and dark sector physics programs. The PAR enables CW linac operation, reduces injection losses, simplifies RF phase locking, and supports beam powers exceeding 100 kW for dark sector experiments, with a projected 87 kW beam power for the 8 GeV neutrino program.
The FNAL accelerator complex is poised to reach MW neutrino beams on target for the exploration of the dark sector physics and rare physics program spaces. Future operations of the complex will include CW linac operations at beam intensities that have not been seen before \cite{PIP2,RCS_LOI}. The ambitious beam program relies on multi-turn H$^{-}$ injection into the FNAL Booster and then extracted into delivery rings or the Booster Neutrino Beam (BNB) 8 GeV HEP program. A new rapid-cycling synchrotron (RCS) will be required to reach the LBNF goal of 2.4 MW because of intense space-charge limitations. There are many accelerator engineering challenges that are already known and many that will be discovered. This proposal calls for an intermediate step that will both facilitate the operation of Booster in the PIP-II era and gain operational experience associated with high power injection rings. This step includes the design, construction and installation of a 0.8 GeV accumulator ring (upgradeable to 1+ GeV) to be located in the PIP-II Booster Transfer Line (BTL). The PIP-II accumulator ring (PAR) may be primarily designed around permanent magnets or use standard iron core magnet technology with an aperture selected to accommodate the desired high intensity protons at 0.8 GeV.
Motivation & Objective
- To address the challenge of injecting high-intensity proton beams into the PIP-II Booster at unprecedented beam intensities.
- To reduce injection losses and operational complexity in the Booster by relocating H⁻ stripping and beam accumulation to a dedicated ring.
- To enable high-power, continuous-wave (CW) beam operations for future 2.4 MW neutrino beam programs and dark sector physics experiments.
- To provide a flexible, upgradeable platform for future beam energy increases and new physics programs using the PIP-II infrastructure.
- To accelerate the path to dark sector physics by enabling a 100-ton LAr scintillation-only detector (PIP2-BD) with world-leading sensitivity.
Proposed method
- Design a folded 0.8 GeV accumulator ring (PAR) with a total circumference of ~477 m, using half the Booster's circumference, located in the PIP-II Booster Transfer Line (BTL) area.
- Utilize permanent magnet technology (Nd2Fe14B or Sm2Co17) to achieve ~0.3 T field in a 3.1-inch aperture, enabling zero-power operation and high reliability.
- Implement single-turn injection from the PIP-II linac into PAR, followed by beam accumulation and subsequent transfer to the Booster for acceleration to 8 GeV.
- Integrate RF cavities and extraction hardware in long straight sections, with beam loss mitigation via shielding and beam dump design at the injection region.
- Enable phase locking of PAR RF to the PIP-II linac RF, simplifying synchronization compared to locking to the Booster RF.
- Simulate beam dynamics and detector responses using Geant4 and BdNMC to assess sensitivity for dark matter signals and CEvNS backgrounds in a proposed 100-ton LAr detector (PIP2-BD).
Experimental results
Research questions
- RQ1Can a 0.8 GeV permanent magnet accumulator ring be designed to handle beam intensities and power levels required for future 2.4 MW neutrino beam programs?
- RQ2How does relocating beam accumulation and H⁻ stripping to PAR reduce injection losses and improve operational stability in the Booster?
- RQ3What is the achievable beam power for dark sector physics experiments using PAR, and can it support world-leading sensitivity to leptophobic and vector portal dark matter?
- RQ4To what extent does PAR simplify RF synchronization and reduce ramp-up time for the PIP-II and DUNE programs?
- RQ5Can the PAR design be upgraded to accept higher beam energies from the PIP-II linac without major modifications?
Key findings
- The PAR design enables beam power of >100 kW for dark sector physics, with a projected 87 kW beam power for the 8 GeV neutrino HEP program.
- The folded ring layout, using half the Booster circumference, allows for a compact footprint in the PIP-II BTL area with minimal impact on PIP-II construction.
- Permanent magnet technology reduces power consumption, improves reliability, and lowers assembly costs, with a baseline field of ~0.3 T in a 3.1-inch aperture.
- Phase locking of PAR RF to the PIP-II linac RF is simpler than to the Booster RF due to PAR’s flat field, improving injection stability.
- The proposed PIP2-BD detector, placed 18 m downstream of a carbon beam dump driven by PAR, achieves world-leading 90% C.L. sensitivity to leptophobic and vector portal dark matter models.
- With a 5-year run and 75% uptime, the setup can probe thermal relic density targets for scalar dark matter, setting new limits in the sub-GeV mass range.
Read this paper
Open the full text in the Nubint reader and ask about any passage as you read.
Read this paper on NubintThis review was generated by AI from the original paper. Please check the paper before citing it.