[Paper Review] HIKE, High Intensity Kaon Experiments at the CERN SPS
HIKE proposes a staged, high-precision program at CERN's SPS to study rare kaon decays, CP violation, and new physics using charged and neutral kaon beams, with beam-dump operation, leveraging existing NA62 infrastructure and detectors. The project aims for unprecedented sensitivity to feebly interacting particles and new physics up to the highest mass scales.
A timely and long-term programme of kaon decay measurements at a new level of precision is presented, leveraging the capabilities of the CERN Super Proton Synchrotron (SPS). The proposed programme is firmly anchored on the experience built up studying kaon decays at the SPS over the past four decades, and includes rare processes, CP violation, dark sectors, symmetry tests and other tests of the Standard Model. The experimental programme is based on a staged approach involving experiments with charged and neutral kaon beams, as well as operation in beam-dump mode. The various phases will rely on a common infrastructure and set of detectors.
Motivation & Objective
- To perform a long-term, high-precision program of kaon decay measurements at the CERN SPS, building on four decades of experience from NA62 and NA48.
- To probe rare kaon decay processes, CP violation, and new physics beyond the Standard Model with enhanced sensitivity compared to current experiments.
- To search for feebly interacting particles (FIPs) with unprecedented sensitivity using beam-dump and dedicated detection techniques.
- To develop a staged experimental approach that evolves over more than a decade, allowing adaptation to changing physics landscapes and enabling parallel user access.
- To utilize existing infrastructure—particularly the ECN3 hall and NA62 detectors—with minimal civil engineering, reducing costs and accelerating deployment.
Proposed method
- To operate with high-intensity proton beams on target, producing charged and neutral kaons via secondary interactions in a target, with beam-dump mode enabling high-coverage detection.
- To employ a staged detector setup: Phase 1 uses a dedicated kaon identification system (KTAG), beam tracker, and veto systems; Phase 2 adds a Main Electromagnetic Calorimeter (MEC); Phase 3 (KLEVER) adds 13 additional Large Angle Veto (LAV) modules.
- To repurpose and upgrade existing NA62 detectors, including the LKr calorimeter, readout systems, and timing detectors, with new readout backends and component reviews.
- To use advanced detection technologies: MCP-PMTs for kaon ID, SiPMs for particle veto and timing systems, scintillating fibers (SciFi) for VetoCounter, and Shashlyk calorimeters for hadronic and muon detection.
- To maintain vacuum at ~10⁻⁶ mbar using seven cryo-pumps, already maintained in 2021, ensuring stable operation for the LKr calorimeter and other detectors.
- To ensure compatibility with other experiments by operating in parallel within the North Area, maximizing physics diversity and resource efficiency.
Experimental results
Research questions
- RQ1What is the sensitivity of the HIKE program to rare kaon decays, particularly those probing CP violation and lepton flavor universality?
- RQ2How can beam-dump operation at the SPS be optimized to maximize detection of long-lived, feebly interacting particles from kaon decays?
- RQ3What is the achievable precision in measuring the branching ratio of the rare decay K⁺ → π⁺νν̄, and how does it compare to current limits?
- RQ4How can the detector system be modularly upgraded across three phases to maintain sensitivity while adapting to evolving theoretical and experimental priorities?
- RQ5What is the cost and technical feasibility of extending the NA62 infrastructure to support a new, long-term kaon physics program with enhanced detector coverage?
Key findings
- Phase 1 of HIKE requires a proton beam intensity of 1.2×10¹³ protons per spill, producing approximately 2×10¹³ kaon decays per year in the fiducial volume.
- Phase 2, involving neutral kaons and tracking, demands 2×10¹³ protons per spill and aims for 3.8×10¹³ kaon decays per year, with the addition of a Main Electromagnetic Calorimeter (MEC) at an estimated cost of 5 MCHF.
- Phase 3 (KLEVER) will extend the Large Angle Veto system from 12 to 25 modules, adding 13 new units at an estimated cost of 9 MCHF, with a total detector cost of 22.3 MCHF for Phase 1 and 36.8 MCHF for the full program.
- The total estimated cost for Phase 1 detectors is 22.3 MCHF, with key components including KTAG (0.5 MCHF), beam tracker (2.5 MCHF), and LAV modules (8 MCHF).
- The LKr calorimeter can remain operational with continuous cryogenic maintenance, and the readout chain will be upgraded with a new back-end and legacy component review.
- The project is designed to require no civil engineering before Long Shutdown 4 (LS4), with minimal infrastructure changes and compatibility with existing electrical and cooling systems, reducing overall cost and risk.
Read this paper
Open the full text in the Nubint reader and ask about any passage as you read.
Read this paper on NubintThis review was generated by AI from the original paper. Please check the paper before citing it.