[Paper Review] How to predict and optimise with asymmetric error metrics
This paper proposes a linear correction method to adjust forecasts for asymmetric error costs in energy scheduling, showing that underforecasting significantly increases optimization costs. By aligning prediction loss functions with the quadratic cost function of the optimization phase, the approach reduces final costs through bias correction, achieving a 1.37× scaling and 0.58 intercept in the optimal forecast correction line for net load predictions.
In this paper, we examine the concept of the predict and optimise problem with specific reference to the third Technical Challenge of the IEEE Computational Intelligence Society. In this competition, entrants were asked to forecast building energy use and solar generation at six buildings and six solar installations, and then use their forecast to optimize energy cost while scheduling classes and batteries over a month. We examine the possible effect of underforecasting and overforecasting and asymmetric errors on the optimisation cost. We explore the different nature of loss functions for the prediction and optimisation phase and propose to adjust the final forecasts for a better optimisation cost. We report that while there is a positive correlation between these two, more appropriate loss functions can be used to optimise the costs associated with final decisions.
Motivation & Objective
- To investigate the impact of forecast errors—especially asymmetric under- and overforecasting—on final optimization costs in energy scheduling.
- To understand the disconnect between traditional forecast accuracy metrics (e.g., MAE) and actual optimization cost performance.
- To propose a method for adjusting forecasts to minimize quadratic optimization costs, particularly under asymmetric error conditions.
- To evaluate whether forecast correction can outperform standard prediction accuracy in real-world energy scheduling outcomes.
Proposed method
- The authors analyze forecast and actual net load data from the IEEE-CIS 3rd Technical Challenge, normalizing values to μ=0 and σ=1 for comparison.
- They derive a linear correction model using a cost-minimizing regression that maps predicted net load to actual net load, minimizing an asymmetric error cost function.
- The correction model is based on a quadratic cost function with asymmetric penalties for under- and overforecasting, incorporating skewness of residuals.
- The method estimates optimal parameters γ=1.37 and ε=0.58 for the linear correction line, minimizing cost rather than standard prediction error.
- The approach compares five optimization strategies, selecting 'no forced discharge' as the baseline for cost evaluation.
- Empirical validation is performed on competition data and perturbed forecast sets to assess cost reduction through forecast adjustment.
Experimental results
Research questions
- RQ1How do asymmetric forecast errors—particularly underforecasting—impact the final optimization cost in energy scheduling?
- RQ2To what extent does traditional forecast accuracy (e.g., MAE) correlate with actual optimization cost in a quadratic cost function setting?
- RQ3Can a linear correction to forecasts reduce final optimization costs more effectively than standard prediction accuracy metrics?
- RQ4What is the optimal form of forecast adjustment that minimizes the cost of the optimization model, given the asymmetric nature of error penalties?
- RQ5Can econometric modeling of cost functions justify the use of quadratic terms and asymmetric error penalties in renewable energy scheduling?
Key findings
- Underforecasting of net load leads to significantly higher optimization costs due to asymmetric penalties in the cost function.
- A linear correction model with γ=1.37 and ε=0.58 was found to minimize the final optimization cost, outperforming uncorrected forecasts.
- The correlation between forecast accuracy (MAE) and optimization cost is positive but not symmetric, with underforecasting having a disproportionately larger impact.
- The skewness of prediction residuals was negatively correlated with cost, confirming that underforecasting is the dominant error type in the dataset.
- The study demonstrates that minimizing standard forecast error metrics does not necessarily minimize final optimization costs, especially under quadratic cost functions.
- Forecast adjustment via cost-minimizing regression is a viable and effective method to improve decision outcomes in predict-and-optimize problems.