[Paper Review] Joint Planning of PEV Fast-Charging Network and Distributed PV Generation Using the Accelerated Generalized Benders Decomposition
This paper proposes a two-stage stochastic mixed-integer second-order cone program (MISOCP) to jointly optimize the siting and sizing of PEV fast-charging stations and distributed photovoltaic (PV) plants on coupled transportation and power networks. Using an accelerated Generalized Benders Decomposition algorithm, the method efficiently solves large-scale problems under uncertainty, demonstrating that joint planning reduces total system costs by up to 5.35% and defers costly grid upgrades by mitigating congestion through PV integration and reactive power control.
Integration of plug-in electric vehicles (PEVs) with distributed renewable resources will decrease PEVs' well-to-wheels greenhouse gas emissions, promote renewable power adoption and defer power system investments. This paper proposes a multidisciplinary approach to jointly planning PEV fast-charging stations and distributed photovoltaic (PV) power plants on coupled transportation and power networks. First, we develop models of 1) PEV fast-charging stations; 2) highway transportation networks under PEV driving range constraints; 3) PV power plants with reactive power control. Then, we formulate a two-stage stochastic mixed integer second order cone program (MISOCP) to determine the sites and sizes of 1) PEV fast-charging stations; 2) PV power plants. To address the uncertainty of future scenarios, a significant number of future typical load, traffic flow and PV generation curves are adopted. This makes the problem large scale. We design a Generalized Benders Decomposition Algorithm to efficiently solve it. To the authors' knowledge, this work is the first that jointly plans both PEV fast-charging stations and PV plants with consideration for PEV driving range limits and reactive PV power control. We conduct numerical experiments to illustrate the effectiveness of the proposed method, and validate the benefits of the joint planning and adopting advanced PV reactive power control.
Motivation & Objective
- To address the challenge of integrating plug-in electric vehicles (PEVs) with distributed renewable energy sources to reduce greenhouse gas emissions and defer power system investments.
- To jointly optimize the locations and capacities of PEV fast-charging stations and distributed PV power plants on coupled transportation and power networks.
- To explicitly model PEV driving range constraints and reactive power control capabilities of PV inverters in the planning process.
- To reduce system costs and congestion by leveraging distributed PV generation to supply local PEV charging demand.
- To evaluate the benefits of reactive power control from PV systems in enhancing voltage quality and operational flexibility.
Proposed method
- Formulates a two-stage stochastic MISOCP to determine optimal sites and sizes of PEV fast-charging stations and distributed PV plants under uncertain future load, traffic, and PV generation profiles.
- Models PEV traffic flows and charging demands on highway networks using a modified capacitated-flow refueling location model with driving range constraints.
- Incorporates reactive power control in PV power plants via grid-connected inverters to support voltage regulation and improve power quality.
- Decomposes the large-scale problem using an accelerated Generalized Benders Decomposition (AGBD) algorithm, separating the master problem (mixed-integer linear) from sub-problems (convex second-order cone programs).
- Solves the problem by iteratively generating Benders cuts to tighten the master problem and converge to the optimal solution efficiently.
- Uses a significant number of typical scenarios for load, traffic, and PV generation to represent uncertainty in the stochastic formulation.
Experimental results
Research questions
- RQ1How can the joint planning of PEV fast-charging stations and distributed PV plants be formulated to minimize total system cost while respecting PEV driving range and power system constraints?
- RQ2What is the impact of integrating distributed PV generation on congestion mitigation and deferred investment in distribution networks?
- RQ3How does reactive power control from PV inverters affect voltage quality and system operational flexibility in high-PEV penetration scenarios?
- RQ4To what extent does joint planning reduce total system costs compared to standalone PEV charging station deployment?
- RQ5How does the scale of PEV population influence the benefits of joint planning and PV integration?
Key findings
- Joint planning of PEV fast-charging stations and PV plants reduces total system cost by 3.19% in Case 2 (vs. Case 1) and 5.35% in Case 5 (vs. Case 4), primarily through reduced operational costs from local PV power generation.
- The installation of distributed PV plants eliminates line congestion in all cases with PV, whereas in cases without PV, up to 1.87% of PEV charging demand could not be met due to thermal overloads.
- Reactive power control from PV inverters significantly reduces voltage deviations—especially mitigating reverse power flow-induced voltage rises—improving power quality even with minimal direct cost savings (<1%).
- The accelerated Generalized Benders Decomposition algorithm solves the large-scale problem in approximately 18 hours, with longer solution times observed under higher PEV populations due to tighter constraints.
- In high-load scenarios, joint planning allows for fewer, lower-cost charging stations by leveraging local PV supply, avoiding costly grid upgrades and congestion-prone areas.
- The method enables deferred investment in transmission and distribution infrastructure by reducing thermal congestion, with no line exceeding 100% thermal loading in PV-integrated cases.