[Paper Review] Measurement of the Spin-Dependence of the pbar-p Interaction at the AD-Ring
This paper proposes the first measurement of spin-dependent total cross sections σ₁ and σ₂ in antiproton-proton (p̄p) interactions at 50–450 MeV using spin filtering in a polarized hydrogen gas target within the AD ring at CERN. The method enables polarization buildup of stored antiprotons, paving the way for a future double-polarized p̄p collider at FAIR with luminosity >10³¹ cm⁻²s⁻¹ and access to key QCD spin observables such as proton transversity and electromagnetic form factors.
We propose to use an internal polarized hydrogen storage cell gas target in the AD ring to determine for the first time the two total spin-dependent pbar-p cross sections sigma_1 and sigma_2 at antiproton beam energies in the range from 50 to 450 MeV. The data obtained are of interest by themselves for the general theory of pbar-p interactions since they will provide a first experimental constraint of the spin-spin dependence of the nucleon-antinucleon potential in the energy range of interest. In addition, measurements of the polarization buildup of stored antiprotons are required to define the optimum parameters of a future, dedicated Antiproton Polarizer Ring (APR), intended to feed a double-polarized asymmetric pbar-p collider with polarized antiprotons. Such a machine has recently been proposed by the PAX collaboration for the new Facility for Antiproton and Ion Research (FAIR) at GSI in Darmstadt, Germany. The availability of an intense stored beam of polarized antiprotons will provide access to a wealth of single- and double-spin observables, thereby opening a new window on QCD spin physics.
Motivation & Objective
- To measure the two total spin-dependent p̄p cross sections σ₁ and σ₂ at antiproton energies from 50 to 450 MeV for the first time.
- To demonstrate polarization buildup of stored antiprotons using spin filtering in an internal polarized hydrogen gas target.
- To provide essential input for the design of a future Antiproton Polarizer Ring (APR) at FAIR.
- To enable a double-polarized asymmetric p̄p collider at FAIR with luminosity exceeding 10³¹ cm⁻²s⁻¹.
- To open new access to fundamental QCD spin observables, including proton transversity and electromagnetic form factors.
Proposed method
- Utilize an internal polarized hydrogen (or deuterium) gas target to induce spin filtering of stored antiprotons in the AD ring.
- Measure spin-dependent p̄p cross sections via the polarization buildup rate of antiprotons, which depends on σ₁ and σ₂.
- Implement a Breit-Rabi polarimeter and target gas analyzer to monitor target polarization and beam polarization in situ.
- Upgrade the AD electron cooler to 300 keV to enable electron cooling up to 450 MeV antiproton beam energy.
- Install a solenoidal Siberian snake in the AD ring to stabilize longitudinal spin orientation for σ₂ measurement.
- Use transverse and longitudinal polarization configurations of the target to separately determine σ₁ and σ₂.
Experimental results
Research questions
- RQ1What are the values of the two total spin-dependent p̄p cross sections σ₁ and σ₂ in the 50–450 MeV energy range?
- RQ2Can spin filtering in a polarized internal gas target efficiently polarize stored antiprotons at beam energies up to 450 MeV?
- RQ3What is the polarization buildup rate of antiprotons in the AD ring using this method, and how does it depend on target polarization and beam energy?
- RQ4Can the AD ring be upgraded to support electron cooling up to 450 MeV to enable effective multiple scattering compensation during spin-filtering?
- RQ5What are the required parameters for a future APR to deliver polarized antiprotons with ~15% polarization for a double-polarized p̄p collider at FAIR?
Key findings
- The proposed method is expected to produce a polarized antiproton beam with at least ten orders of magnitude higher intensity than previous secondary polarized beams.
- Polarization buildup studies using transverse target polarization are feasible at beam energies from 30 to 70 MeV with the existing AD electron cooler.
- The electron cooler upgrade to 300 keV is required to extend the energy range to 450 MeV and enable full spin-filtering measurements.
- The installation of a Siberian snake is necessary to stabilize the beam spin direction for the measurement of σ₂.
- Phase 3 measurements with transverse polarization are anticipated to require six weeks of beamtime in 2012.
- Phase 7, involving longitudinal polarization and full commissioning of the Siberian snake, is expected to require eight weeks of beamtime in 2014.
Read this paper
Open the full text in the Nubint reader and ask about any passage as you read.
Read this paper on NubintThis review was generated by AI from the original paper. Please check the paper before citing it.