[Paper Review] On PMU Location Selection for Line Outage Detection in Wide-area Transmission Networks

Yue Zhao, Andrea Goldsmith|arXiv (Cornell University)|Jul 27, 2012
Power System Optimization and StabilityEngineering10 references24 citations
TL;DR

This paper proposes a branch and bound algorithm to find globally optimal PMU locations for detecting line outages in transmission networks by maximizing the minimum distance between voltage phase angle signatures of outages. It shows that approximately one-third of buses providing PMU measurements achieves the same outage detection performance as using all buses, significantly reducing deployment costs while maintaining optimal performance.

ABSTRACT

The optimal PMU locations to collect voltage phase angle measurements for detecting line outages in wide-area transmission networks are investigated. The problem is established as one of maximizing the minimum distance among the voltage phase angle signatures of the outages, which can be equivalently formulated as an integer programming problem. Based on a greedy heuristic and a linear programming relaxation, a branch and bound algorithm is proposed to find the globally optimal PMU locations. Using this algorithm, the optimal tradeoff between the number of PMUs and the outage detection performance is characterized for IEEE 14, 24 and 30 bus systems. The algorithm is shown to find the globally optimal PMU locations in a small number of iterations. It is observed that it is sufficient to have roughly one third of the buses providing PMU measurements in order to achieve the same outage detection performance as with all the buses providing PMU measurements.

Motivation & Objective

  • To address the challenge of selecting optimal PMU locations for real-time line outage detection in wide-area transmission networks.
  • To characterize the trade-off between the number of PMUs and outage detection performance under practical constraints.
  • To develop a globally optimal PMU location selection method that ensures maximum separability of outage signatures.
  • To demonstrate that a reduced number of PMUs—around one-third of buses—can achieve performance equivalent to full PMU deployment.

Proposed method

  • Formulate the PMU location selection problem as maximizing the minimum distance between voltage phase angle signatures of different line outages.
  • Model the problem as an integer programming (IP) formulation to enable exact optimization.
  • Use a greedy heuristic to generate a lower bound on the optimal solution.
  • Apply linear programming relaxation to compute an upper bound on the optimal solution.
  • Develop a branch and bound algorithm that iteratively fixes PMU locations and updates bounds using the heuristic and relaxation.
  • Extend the framework to non-adaptive PMU selection by considering multiple typical network operating conditions and power injection profiles.

Experimental results

Research questions

  • RQ1What is the optimal trade-off between the number of PMUs and the minimum separation between outage signatures in transmission networks?
  • RQ2Can a globally optimal PMU location configuration be efficiently computed for line outage detection?
  • RQ3Is it possible to achieve near-full observability performance with significantly fewer PMUs than the total number of buses?
  • RQ4How does the performance of the proposed method compare to heuristic or suboptimal approaches in standard test systems?
  • RQ5Can the proposed framework be extended to non-adaptive PMU placement under varying network operating conditions?

Key findings

  • The proposed branch and bound algorithm finds globally optimal PMU locations in at most 19 iterations, with most cases converging in far fewer steps.
  • For IEEE 14, 24, and 30 bus systems, the optimal PMU configuration achieves the same minimum distance between outage signatures as full PMU deployment.
  • It is sufficient to install PMUs on approximately one-third of the buses to match the outage detection performance of full PMU coverage.
  • The greedy heuristic provides a reliable lower bound, and the LP relaxation offers a tight upper bound, enabling efficient convergence.
  • The max-min distance criterion effectively captures the separability of outage signatures and leads to robust PMU placement decisions.
  • The method generalizes well to non-adaptive scenarios by incorporating multiple typical operating conditions and power injection profiles.

Read this paper

Open the full text in the Nubint reader and ask about any passage as you read.

Read this paper on Nubint

This review was generated by AI from the original paper. Please check the paper before citing it.