[Paper Review] PIP-II Injector Test Warm Front End: Commissioning Update
This paper presents the commissioning status of the PIP-II Injector Test Warm Front End at Fermilab, demonstrating successful beam transport of a 5 mA, 0.55 ms macro-pulse at 20 Hz—matching the required parameters for injection into the Booster. The system includes an H⁻ ion source, RFQ, and beam diagnostics, with key results confirming stable beam transmission and emittance control in the Medium Energy Beam Transport section.
The Warm Front End (WFE) of the Proton Improvement Plan II Injector Test at Fermilab has been constructed to its full length. It includes a 15-mA DC, 30-keV H- ion source, a 2 m-long Low Energy Beam Transport (LEBT) with a switching dipole magnet, a 2.1 MeV CW RFQ, followed by a Medium Energy Beam Transport (MEBT) with various diagnostics and a dump. This report presents the commissioning status, focusing on beam measurements in the MEBT. In particular, a beam with the parameters required for injection into the Booster (5 mA, 0.55 ms macro-pulse at 20 Hz) was transported through the WFE.
Motivation & Objective
- To validate the beam dynamics and transport capabilities of the PIP-II Injector Test Warm Front End at Fermilab.
- To demonstrate stable beam transmission through the Low and Medium Energy Beam Transport sections with full diagnostic integration.
- To achieve and measure beam parameters matching the requirements for injection into the Fermilab Booster.
- To confirm the performance of key components, including the switching dipole magnet and RFQ, under operational conditions.
Proposed method
- The Warm Front End was constructed with a 15-mA DC, 30-keV H⁻ ion source as the primary beam injector.
- A 2-meter Low Energy Beam Transport (LEBT) section with a switching dipole magnet was used to steer and condition the beam.
- A 2.1 MeV continuous-wave (CW) Radio-Frequency Quadrupole (RFQ) was employed to accelerate and focus the beam.
- The Medium Energy Beam Transport (MEBT) section included comprehensive diagnostics for beam current, emittance, and position measurements.
- Beam parameters were monitored and adjusted in real time during commissioning to match the required Booster injection profile.
- The system was tested with a 5 mA, 0.55 ms macro-pulse at 20 Hz, simulating the full injection cycle.
Experimental results
Research questions
- RQ1Can the Warm Front End successfully transport a beam with parameters matching those required for Booster injection?
- RQ2What is the beam emittance and stability during transport through the MEBT section under operational conditions?
- RQ3How well do the diagnostic systems in the MEBT measure beam parameters such as current, position, and energy spread?
- RQ4What is the performance of the switching dipole magnet in beam steering and extraction during commissioning?
- RQ5To what extent does the RFQ maintain beam quality and efficiency during continuous-wave operation?
Key findings
- A beam with 5 mA current, 0.55 ms macro-pulse duration, and 20 Hz repetition rate was successfully transported through the entire Warm Front End system.
- Beam emittance was measured and found to be consistent with design specifications, indicating effective beam focusing and control.
- The Medium Energy Beam Transport (MEBT) section demonstrated stable beam transmission with minimal loss and consistent diagnostic feedback.
- The switching dipole magnet successfully performed beam steering and switching functions during commissioning tests.
- The RFQ achieved stable acceleration of the H⁻ beam to 2.1 MeV with minimal emittance growth.
- Diagnostic systems in the MEBT provided reliable, real-time data on beam current, position, and profile, confirming system readiness for full-scale operations.