Skip to main content
QUICK REVIEW

[Paper Review] Scheduling Autonomous Vehicle Platoons Through an Unregulated Intersection

Juan José Besa Vial, William E. Devanny|arXiv (Cornell University)|Sep 15, 2016
Traffic control and managementEngineering23 references12 citations
TL;DR

This paper presents polynomial-time algorithms for scheduling autonomous vehicle platoons through unregulated intersections to minimize maximum delay, using dynamic programming and parametric search for k-way merge and two-way crossing scenarios. It proves the more general problem—combining non-constant k-way merges and two-way traffic—is NP-complete via a reduction from the partition problem.

ABSTRACT

We study various versions of the problem of scheduling platoons of autonomous vehicles through an unregulated intersection, where an algorithm must schedule which platoons should wait so that others can go through, so as to minimize the maximum delay for any vehicle. We provide polynomial-time algorithms for constructing such schedules for a $k$-way merge intersection, for constant $k$, and for a crossing intersection involving two-way traffic. We also show that the more general problem of scheduling autonomous platoons through an intersection that includes both a $k$-way merge, for non-constant $k$, and a crossing of two-way traffic is NP-complete.

Motivation & Objective

  • Address the challenge of coordinating autonomous vehicle platoons through unregulated intersections without traffic signals or stop signs.
  • Minimize the maximum delay experienced by any vehicle in a platoon while preserving platoon integrity.
  • Develop efficient scheduling algorithms for specific intersection types: k-way merge (constant k) and two-way crossing.
  • Establish computational complexity boundaries by proving NP-completeness for the general case involving non-constant k-way merges and two-way traffic.
  • Provide offline scheduling solutions assuming full advance knowledge of platoon paths and arrival times.

Proposed method

  • Formulate the scheduling problem using a discrete time and space model where platoons move in lockstep and cannot reverse.
  • Apply dynamic programming techniques to construct optimal schedules for k-way merge and two-way crossing intersections with constant k.
  • Use parametric search to efficiently solve optimization problems under delay constraints.
  • Model the intersection as a set of lanes with non-interference constraints, ensuring no two platoons occupy conflicting paths simultaneously.
  • Reduce the PARTITION problem to the MULTI-CROSS problem to prove NP-completeness for the general case.
  • Define a decision problem with a maximum delay parameter d_max and validate schedules for feasibility and delay bounds.

Experimental results

Research questions

  • RQ1Can we design polynomial-time algorithms for scheduling autonomous platoons through a k-way merge intersection when k is constant?
  • RQ2Is it possible to efficiently schedule platoons through a two-way crossing intersection while minimizing maximum delay?
  • RQ3What is the computational complexity of scheduling platoons through an intersection combining a non-constant k-way merge and two-way traffic?
  • RQ4Can we prove that the general scheduling problem is NP-complete under realistic constraints?
  • RQ5Are there efficient offline algorithms for scheduling platoons when all arrival and exit times are known in advance?

Key findings

  • Polynomial-time algorithms exist for scheduling platoons through a k-way merge intersection when k is constant, using dynamic programming and parametric search.
  • A polynomial-time algorithm is provided for two-way crossing intersections, preserving platoon continuity and minimizing maximum delay.
  • The general problem combining a non-constant k-way merge and two-way traffic is proven NP-complete via a reduction from the partition problem.
  • The maximum delay in the constructed schedules is bounded by 2q+1 when a valid partition of the input set exists, with exact delays achieved for key platoons.
  • The NP-completeness result holds because any delay exceeding 2q+1 would violate the maximum delay constraint, forcing specific scheduling orderings that correspond to a valid partition.
  • The problem remains in NP since any proposed schedule can be validated in polynomial time to check for collisions and compute maximum delay.

Read this paper

Open the full text in the Nubint reader and ask about any passage as you read.

Read this paper on Nubint

This review was generated by AI from the original paper. Please check the paper before citing it.