Skip to main content
QUICK REVIEW

[Paper Review] Spin Physics from COSY to FAIR

A. Kacharava, F. Rathmann|ArXiv.org|Nov 17, 2005
Distributed and Parallel Computing SystemsComputer Science3 references19 citations
TL;DR

This paper proposes a comprehensive spin physics programme at the COSY storage ring, utilizing polarized proton and deuteron beams with a polarized internal target to study nucleon-nucleon interactions, meson production, and hyperon resonances. It outlines a path toward a polarized antiproton facility at FAIR, with key experiments planned for 2006–2009 and the Antiproton Polariser Ring (APR) designed for construction by 2008.

ABSTRACT

It is the aim of the ANKE-COSY spin collaboration to carry out a well directed programme of internationally competitive experiments involving polarised beams and targets, using the outstanding facilities available at the storage ring. These activities, at the same time, are good preparation for our participation in the PAX@FAIR project.

Motivation & Objective

  • To conduct a systematic programme of spin-observables measurements in nucleon-nucleon and meson production reactions using polarized beams and targets at COSY.
  • To develop and commission a polarized internal target (PIT) system for high-luminosity experiments with polarized protons and deuterons.
  • To prepare for the PAX@FAIR project by validating experimental techniques and instrumentation at COSY.
  • To measure low-energy spectator protons from np and dp interactions to determine center-of-mass energies with high precision.
  • To design and initiate construction of the Antiproton Polariser Ring (APR) for future polarized antiproton physics at FAIR.

Proposed method

  • Utilize COSY's electron cooler and stochastic cooling systems to produce high-intensity, highly polarized proton and deuteron beams (up to 1.2×10¹⁰ protons with >80% polarization).
  • Install and commission a polarized internal target (PIT) system based on an atomic beam source feeding a storage cell, with in-situ calibration using a Lamb-shift polarimeter.
  • Employ the ANKE magnetic spectrometer with multi-wire proportional chambers, scintillator hodoscopes, and range telescopes for particle tracking and identification.
  • Use double-sided micro-structured Si(Li) and thin (69 μm) Si detectors to measure low-energy spectator protons (2.5–40 MeV) with high angular and energy resolution.
  • Implement silicon tracking telescopes in the target chamber to detect low-energy particles from quasi-free and elastic scattering processes.
  • Apply Monte Carlo simulations and data analysis techniques to model and interpret double-polarized reactions, including charge-exchange and quasi-elastic scattering.

Experimental results

Research questions

  • RQ1What are the spin-dependent differential cross sections for np and dp reactions at low and intermediate energies with high polarization control?
  • RQ2How accurately can the center-of-mass energy be determined from spectator proton measurements in np and dp interactions?
  • RQ3What are the spin observables in non-strange and strange meson production (e.g., π⁰, η, ω, φ) in polarized nucleon-nucleon collisions?
  • RQ4Can the polarized internal target system achieve sufficient luminosity and polarization stability for high-precision spin physics?
  • RQ5What are the technical and operational requirements for constructing the Antiproton Polariser Ring (APR) as a precursor to the PAX@FAIR experiment?

Key findings

  • The polarized internal target (PIT) system was successfully tested in situ at COSY in February 2005 and was scheduled for commissioning in early 2006.
  • The ANKE spectrometer and silicon tracking telescopes enabled high-precision measurement of spectator protons with energies from 2.5 MeV to 40 MeV and geometrical acceptance of ~10% per telescope.
  • Double-polarized np experiments were planned to begin in July 2006, with data taking scheduled for approximately three months in 2007.
  • The programme included dedicated data-taking phases for non-strange meson production (2008) and strange meson/baryon production (2009), each lasting ~3 months.
  • The Antiproton Polariser Ring (APR) design was scheduled for completion by 2007, with construction beginning in 2008 and commissioning planned for 2010–2011.
  • The programme included eight PhD students actively working on Monte Carlo simulations and data analysis for spin physics, with initial data from unpolarized storage-cell targets already in analysis.

Read this paper

Open the full text in the Nubint reader and ask about any passage as you read.

Read this paper on Nubint

This review was generated by AI from the original paper. Please check the paper before citing it.