This paper presents the status of the Super B detector design as of June 2010, detailing advancements in silicon vertex tracking, calorimetry, and trigger systems. It outlines a cost-optimized, modular design leveraging B-Factory experience and new technologies like MAPS and LYSO crystals, with a projected construction and commissioning timeline of just over five years.
This report describes the present status of the detector design for SuperB. It is one of four separate progress reports that, taken collectively, describe progress made on the SuperB Project since the publication of the SuperB Conceptual Design Report in 2007 and the Proceedings of SuperB Workshop VI in Valencia in 2008. The other three reports relate to Physics, Accelerator and Computing.
Motivation & Objective
- To update the scientific community on the state of the Super B detector design following the 2007 Conceptual Design Report and 2008 Valencia Workshop.
- To detail progress in key subsystems including the silicon vertex tracker, electromagnetic calorimeters, and trigger/DAQ systems.
- To provide a comprehensive cost estimate and construction schedule based on B-Factory (BaBar) experience and new technology integration.
- To identify open issues and R&D challenges in detector subsystems, particularly in radiation hardness and data readout scalability.
- To establish a baseline design for future construction, emphasizing reusability of components and cost efficiency.
Proposed method
- The detector design is based on a hybrid approach combining existing BaBar infrastructure with new technologies such as MAPS (Monolithic Active Pixel Sensors) and LYSO scintillators.
- Cost estimates are derived from BaBar experience, vendor quotes, and engineering estimates, with adjustments for inflation and lessons learned.
- The silicon vertex tracker (SVT) design includes Layer0 options such as striplets, hybrid pixels, and MAPS, with performance studies under background conditions.
- Calorimeter systems (barrel, forward, backward endcaps) use LYSO crystals, APDs, and MPPCs, with support structures and readout electronics estimated from prototype data.
- Trigger and DAQ systems are modeled by scaling from BaBar, with modifications for higher data rates and improved system integration.
- Installation and commissioning schedules are based on a detailed timeline derived from BaBar disassembly and reassembly, including cosmic ray testing.
Experimental results
Research questions
- RQ1How can the Super B detector achieve the required vertex resolution and particle identification performance for rare B-meson decays?
- RQ2What are the most cost-effective and scalable solutions for high-rate, high-precision tracking and calorimetry in a high-luminosity B-factory environment?
- RQ3To what extent can BaBar components be reused, and what modifications are required for the new detector configuration?
- RQ4What are the key technical and cost drivers for the detector subsystems, and how are uncertainties being addressed in the design phase?
- RQ5How can the trigger and data acquisition system be redesigned to handle increased data rates while maintaining low latency and high efficiency?
Key findings
- The baseline detector design incorporates advanced technologies such as MAPS for the silicon vertex tracker and LYSO crystals for the forward and backward calorimeters.
- Cost estimates are based on vendor quotes, BaBar experience, and engineering judgment, with the barrel calorimeter's reuse value factored in via inflation-adjusted escalation.
- The total construction and commissioning timeline is estimated at just over five years, starting after final design and TDR completion.
- The electronics and photodetectors are the primary cost drivers for the instrumented flux return (IFR), despite the active detector components being relatively inexpensive.
- The trigger and DAQ systems are estimated using a hybrid method: scaling from BaBar for similar components and direct estimation for new or redesigned subsystems.
- The design includes provisions for centralized development work and system upgrades, informed by lessons learned from the BaBar Online system's decentralized evolution.
Read this paper
Open the full text in the Nubint reader and ask about any passage as you read.
Read this paper on NubintThis review was generated by AI from the original paper. Please check the paper before citing it.