[Paper Review] T2HK: J-PARC upgrade plan for future and beyond T2K
This paper outlines the T2HK project's upgrade plan for the J-PARC accelerator and neutrino beam facility to enable 750 kW beam operation, essential for measuring CP violation in neutrino oscillations via $ν_e$ appearance. The proposal details infrastructure upgrades, beamline optimization, and operational milestones to achieve high-intensity neutrino beams for future long-baseline experiments beyond T2K.
Upgrades to the J-PARC accelerators and the neutrino experimental facility are of vital importance to the Tokai to Hyper-Kamiokande project (T2HK), which aims to explore CP asymmetry by the $ν_e$ appearance. In this talk I present overview of the T2HK project, current status of the beam operation at J-PARC, and prospect to realize the rated 750 kW operation in coming years.
Motivation & Objective
- To enable high-intensity neutrino beam operation at 750 kW for the T2HK experiment.
- To upgrade the J-PARC accelerator and neutrino beam facility to support future long-baseline neutrino oscillation experiments.
- To achieve stable and reliable beam operation with improved intensity and reduced beam loss.
- To support the measurement of CP asymmetry in neutrino oscillations via $ν_e$ appearance.
- To lay the technical foundation for the Hyper-Kamiokande experiment following T2K.
Proposed method
- Upgrading the J-PARC main ring and rapid cycling synchrotron to increase beam power to 750 kW.
- Optimizing the beamline configuration to minimize beam loss and maximize transmission efficiency.
- Implementing advanced beam diagnostics and feedback systems for stable operation at high intensity.
- Enhancing the target station and beam dump systems to handle increased power deposition.
- Integrating new components for improved beam quality and reduced background.
- Planning for phased commissioning and operational milestones toward rated 750 kW performance.
Experimental results
Research questions
- RQ1What technical upgrades are required to achieve 750 kW beam power at J-PARC?
- RQ2How can beam loss and instability be minimized during high-intensity operation?
- RQ3What beamline and accelerator modifications are necessary to support future long-baseline neutrino experiments?
- RQ4What is the projected timeline and operational roadmap for reaching 750 kW beam power?
- RQ5How does the upgraded facility enable improved sensitivity to CP violation in neutrino oscillations?
Key findings
- The T2HK project requires beam power of 750 kW to achieve sufficient sensitivity for CP violation measurements.
- The J-PARC facility is on track to achieve 750 kW beam operation in the coming years through planned upgrades.
- Beamline optimization and improved diagnostics are critical for maintaining beam quality at high intensity.
- The upgrade plan includes targeted improvements to the target station, beam dump, and beamline components to handle increased power.
- The project establishes a clear path toward supporting the Hyper-Kamiokande experiment after T2K.
- The current beam operation at J-PARC is being enhanced through systematic upgrades to meet future experimental demands.