Skip to main content
QUICK REVIEW

[Paper Review] The application of muon tomography to the imaging of railway tunnels

L.F. Thompson, J.P. Stowell|White Rose Research Online (University of Leeds, The University of Sheffield, University of York)|Jun 13, 2019
Particle Detector Development and PerformancePhysics and Astronomy8 references6 citations
TL;DR

This study demonstrates the first field application of portable cosmic ray muon tomography to image the overburden of a UK railway tunnel, successfully identifying a previously unknown hidden void with high statistical significance in just 30-minute scans. The technique enables non-invasive, rapid detection of subsurface density anomalies such as abandoned construction shafts, offering a safe alternative to intrusive drilling for railway infrastructure monitoring.

ABSTRACT

Cosmic Ray Muon Radiography utilizes highly-penetrating cosmic ray muons to image the density profile of an object of interest. Here we report on the first trial to use a portable field-deployable cosmic ray tracking system in order to image the whole overburden of a UK railway tunnel with short duration scans (c. 30 minutes). A unknown overburden void was identified and, post-trial, confirmed by railway authorities. These experiments demonstrate the identification of hidden construction shafts with high levels of statistical significance as density anomalies within the data.

Motivation & Objective

  • To develop and deploy a portable, field-deployable cosmic ray muon tracking system for non-invasive imaging of railway tunnel overburden.
  • To detect hidden voids or density anomalies in the overburden of disused railway tunnels without relying on historical records or intrusive methods.
  • To validate the technique's capability in real-world conditions with limited access and incomplete topographical data.
  • To demonstrate that muon tomography can identify potential structural hazards such as abandoned construction shafts in live or disused railway tunnels.

Proposed method

  • The system uses two layers of EJ-200 plastic scintillators—six 90×15×4 cm bars in the upper layer and three 30×30×4 cm paddles in the lower layer—positioned perpendicular to the tunnel axis.
  • Muon detection is triggered by a hardware-based logical OR of the lower-layer paddles, followed by a software-based logical AND between upper and lower layer signals within a 64 ns time window.
  • Signal processing employs CAEN DT5740 digitizers sampling at 62.5 MHz, with individual detector thresholds optimized to maximize muon detection efficiency (88–98%) while rejecting noise.
  • Muon flux rates are compared against expected values derived from topographical surveys and inferred overburden estimates, using angular binning across 18 lines of sight to improve spatial resolution.
  • A redundant data analysis approach allows estimation of overburden height even with limited or inaccurate topographical data by combining muon flux measurements with assumed rock density.
  • Statistical significance of flux deviations is assessed to identify regions of lower density (e.g., voids) relative to expected overburden.

Experimental results

Research questions

  • RQ1Can a portable, field-deployable muon tomography system detect hidden voids in the overburden of a railway tunnel with high statistical confidence?
  • RQ2How accurately can muon tomography estimate overburden thickness when topographical data is incomplete or unavailable?
  • RQ3To what extent can muon flux anomalies be attributed to large-scale geological features versus localized subsurface voids?
  • RQ4Can muon tomography reliably identify abandoned construction shafts in disused railway tunnels without prior knowledge or historical records?
  • RQ5How does the system perform in real-world conditions with limited access and short scan durations (e.g., 30 minutes)?

Key findings

  • A previously unknown hidden void was identified at 80 m along the Alfreton Old Tunnel using only 100 hours of muon data, with a statistically significant excess in muon flux compared to expected and inferred rates.
  • The void was confirmed post-trial by railway authorities, who had previously expressed concerns about subsurface instability at that location.
  • The system successfully detected three known open shafts with high statistical significance, validating its accuracy and sensitivity.
  • The technique demonstrated robustness in estimating overburden thickness using redundant muon data, even when topographical data was limited or inaccurate.
  • A 20 m binning strategy reduced sensitivity to small-scale surface features, enabling reliable overburden estimation in areas with poor access or missing ground-level data.
  • The method enabled inference of surface height and overburden from muon flux data alone, reducing reliance on high-resolution topographical surveys.

Read this paper

Open the full text in the Nubint reader and ask about any passage as you read.

Read this paper on Nubint

This review was generated by AI from the original paper. Please check the paper before citing it.