Skip to main content
QUICK REVIEW

[Paper Review] The European Spallation Source neutrino Super Beam

M. Dracos, Baussan, E.|arXiv (Cornell University)|Mar 15, 2022
Particle accelerators and beam dynamicsEngineering6 citations
TL;DR

The paper proposes the European Spallation Source neutrino Super Beam (ESSνSB), a high-intensity neutrino experiment using the ESS's 5 MW proton LINAC upgraded to 10 MW to produce a super-beam for measuring CP violation at the second oscillation maximum. With a 10-year run and a 500 kt water Cherenkov far detector at 360–540 km, ESSνSB achieves >70% discovery coverage for CP violation at 5σ significance and measures δCP with <8° error across all values.

ABSTRACT

In this Snowmass 2021 white paper, we summarise the Conceptual Design of the European Spallation Source neutrino Super Beam (ESSvSB) experiment and its synergies with the possible future muon based facilities, e.g. a Low Energy nuSTORM and the Muon Collider. The ESSvSB will benefit from the high power, 5 MW, of the European Spallation Source (ESS) LINAC in Lund-Sweden to produce the world most intense neutrino beam, enabling measurements to be made at the second oscillation maximum. Assuming a ten-year exposure, physics simulations show that the CP-invariance violation can be established with a significance of 5 sigma over more than 70% of all values of delta CP and with an error in the measurement of the delta CP angle of less than 8 degree for all values of delta CP. However, several technological and physics challenges must be further studied before achieving a final Technical Design. Measuring at the 2nd oscillation maximum necessitates a very intense neutrino beam with the appropriate energy. For this, the ESS proton beam LINAC, which is designed to produce the world's most intense neutron beam, will need to be upgraded to 10 MW power, 2.5 GeV energy and 28 Hz beam pulse repetition rate. An accumulator ring will be required for the compression of the ESS LINAC beam pulse from 2.86 ms to 1.3 mus. A high power target station facility will be needed to produce a well-focused intense (super) mu-neutrino beam. The physics performance of that neutrino Super Beam in conjunction with a megaton underground Water Cherenkov neutrino far detector installed at a distance of either 360 km or 540 km from the ESS, the baseline, has been evaluated.

Motivation & Objective

  • To enable high-precision measurement of the leptonic CP-violating phase δCP using a long-baseline neutrino experiment.
  • To overcome the limitations of systematic uncertainties in current long-baseline experiments by targeting the second oscillation maximum.
  • To leverage the ESS's high-power proton LINAC (upgraded to 10 MW) to produce an intense neutrino beam for enhanced sensitivity.
  • To establish synergies with future muon-based facilities, such as low-energy nuSTORM and a Muon Collider, through shared infrastructure and beam utilization.
  • To demonstrate the feasibility of a megaton-scale water Cherenkov detector at 360–540 km baseline for next-generation neutrino oscillation physics.

Proposed method

  • Utilize the ESS proton LINAC, upgraded from 5 MW to 10 MW, 2.5 GeV, 28 Hz, to produce a high-intensity neutrino beam.
  • Implement an accumulator ring to compress the 2.86 ms LINAC pulse to 1.3 µs, enabling high peak intensity.
  • Employ a high-power target station to produce a well-focused, intense (super) μ-neutrino beam.
  • Install a megaton-scale underground water Cherenkov far detector at either 360 km or 540 km baseline to observe neutrino oscillations at the second maximum.
  • Use a beam switchyard and compressor/buncher ring to manage beam extraction and phase rotation for optimal beam compression.
  • Integrate the neutrino beamline with future muon production to enable downstream experiments like low-energy nuSTORM and a Muon Collider.

Experimental results

Research questions

  • RQ1Can a neutrino Super Beam from the ESS LINAC achieve 5σ discovery significance for CP violation across more than 70% of δCP values?
  • RQ2What is the achievable precision in measuring δCP using the second oscillation maximum, and can it be maintained across all δCP values?
  • RQ3How can the ESS proton driver be upgraded to 10 MW to support a Super Beam with sufficient intensity for second-maximum measurements?
  • RQ4What are the technical requirements for beam compression, including accumulator and compressor rings, to achieve sub-microsecond pulses?
  • RQ5What synergies exist between ESSνSB and future muon-based facilities such as low-energy nuSTORM and a Muon Collider?

Key findings

  • After 10 years of data taking, ESSνSB achieves a discovery significance of 5σ for CP violation over more than 70% of all δCP values.
  • The measurement error on δCP is less than 8° for all values of δCP, ensuring high-precision determination across the full phase space.
  • The second oscillation maximum significantly reduces the impact of systematic uncertainties, enhancing robustness compared to first-maximum experiments.
  • The ESS LINAC, when upgraded to 10 MW, provides the necessary beam power to compensate for the longer baseline and lower statistics at the second maximum.
  • The project enables future upgrades via co-production of muons, supporting the development of low-energy nuSTORM and a Muon Collider at the same site.
  • The proposed timeline includes a Conceptual Design Study by 2022, with construction beginning in 2030 and operations expected from 2030 onward, leveraging annual ESS shutdowns for upgrades.

Read this paper

Open the full text in the Nubint reader and ask about any passage as you read.

Read this paper on Nubint

This review was generated by AI from the original paper. Please check the paper before citing it.