[Paper Review] The International Linear Collider: Prospects and Possible Timelines

J. Mnich|arXiv (Cornell University)|Jan 29, 2019
Particle Accelerators and Free-Electron LasersEngineering5 references3 citations
TL;DR

The paper proposes the International Linear Collider (ILC) as a next-generation lepton collider to address key challenges in particle physics, including Higgs boson precision measurements and physics beyond the Standard Model. Using superconducting radio-frequency cavities and a staged energy upgrade from 250 GeV to 1000 GeV, the ILC offers a technically mature, cost-effective path to high-luminosity physics with a potential start of operations in the mid-2030s if endorsed by Japan and international partners.

ABSTRACT

The case for the International Linear Collider and the prospects for its realisation as well as possible timelines are discussed.

Motivation & Objective

  • To evaluate the scientific and technical feasibility of the International Linear Collider (ILC) as the next major particle physics facility after the LHC.
  • To address fundamental challenges in particle physics, including the hierarchy problem, dark matter, electroweak symmetry breaking, and matter-antimatter asymmetry.
  • To establish the ILC as a Higgs factory capable of precision measurements of Higgs couplings and top quark properties at the percent level.
  • To assess the technical maturity of the ILC design, including beam dynamics, cavity performance, and detector readiness.
  • To outline a realistic timeline and cost structure, emphasizing staged construction and international collaboration for cost-sharing and project sustainability.

Proposed method

  • The ILC is designed as a linear electron-positron collider with a center-of-mass energy range of 250–1000 GeV, using superconducting niobium cavities operating at 1.3 GHz and cooled to 2 K.
  • The baseline design for a 500 GeV ILC includes 16,000 cavities organized into 1,800 cryo-modules over 30 km, achieving a luminosity of at least 1.8×10³⁴ cm⁻²s⁻¹.
  • The project employs a staged approach: initial operation at 250 GeV (20 km, ~2000 cavities), followed by upgrades to 500 GeV and 1000 GeV to access higher-energy physics.
  • The European XFEL facility in Hamburg serves as a technological prototype, demonstrating the feasibility of industrial-scale production of ILC components, including 800 niobium cavities with an average gradient of 23.6 MV/m.
  • Two mature detector concepts—ILD and SiD—have been developed, with detailed solutions for all components, ensuring detector readiness.
  • Cost and power consumption estimates are based on linear scaling with energy (163 MW for 500 GeV), with total cost for the 250 GeV version estimated at 6.35–7.03 billion USD, excluding detectors and operations.

Experimental results

Research questions

  • RQ1Can the ILC achieve the required luminosity and beam energy to enable precision measurements of the Higgs boson and top quark properties?
  • RQ2What are the technical and cost implications of a staged ILC construction starting at 250 GeV and upgrading to 500 GeV and 1000 GeV?
  • RQ3How does the ILC compare to circular colliders in terms of energy reach, cost scaling, and power consumption?
  • RQ4What role does the European XFEL play in validating the technological readiness of ILC components?
  • RQ5What are the key milestones and timelines for international approval, construction, and first physics at the ILC?

Key findings

  • The ILC is technically mature, with the European XFEL demonstrating the feasibility of industrial-scale production of superconducting cavities and cryo-modules.
  • The 500 GeV ILC design achieves a luminosity of at least 1.8×10³⁴ cm⁻²s⁻¹ using 16,000 cavities with Q factors >10¹⁰ and average gradients above 35 MV/m.
  • The 250 GeV version of the ILC is expected to cost between 6.35 and 7.03 billion USD, with 4 billion USD allocated to the accelerator and 1 billion USD to detectors.
  • The ILC can operate as a Higgs factory at 250 GeV, enabling precision measurements of Higgs couplings to the percent level, which are unattainable at the LHC.
  • The project is designed for extendability to higher energies and supports polarized beams, enhancing its physics reach for new physics beyond the Standard Model.
  • A positive decision from the Japanese government by early March 2019 is critical to initiate international negotiations and a four-year preparation phase, with first physics possible in the mid-2030s.

Read this paper

Open the full text in the Nubint reader and ask about any passage as you read.

Read this paper on Nubint

This review was generated by AI from the original paper. Please check the paper before citing it.