[Paper Review] A gap clearing kicker for Main Injector
This paper presents a gap clearing kicker system implemented at Fermilab's Main Injector to mitigate beam loss caused by residual particles in the injection gap during slip stacking operations. The system uses fast-rising pulsed magnets to deflect leftover beam particles into the beam abort system, reducing localized losses and enabling stable high-power beam operation since 2010.
Fermilab Main Injector has been operating at high Beam Power levels since 2008 when multi-batch slip stacking became operational. In order to maintain and increase the beam power levels the localized beam loss due to beam left over in the injection kicker gap during slip stacking needs to be addressed. A set of gap clearing kickers that kick any beam left in the injection gap to the beam abort have been built. The kickers were installed in the summer of 2009 and became operational in November of 2010. The kicker performance and its effect on the beam losses will be described.
Motivation & Objective
- Address localized beam losses caused by residual particles in the injection kicker gap during slip stacking at the Main Injector.
- Enable sustained high beam power operation by minimizing beam loss in critical injection regions.
- Design and implement a fast-acting kicker system to clear residual beam from the gap between beam batches.
- Ensure compatibility with existing slip stacking infrastructure and beam dynamics without disrupting beam quality.
- Validate system performance through operational testing and beam loss monitoring post-installation.
Proposed method
- Design and fabricate a set of fast-rising pulsed kicker magnets capable of delivering precise, high-amplitude current pulses.
- Install the gap clearing kickers at the injection region to intercept beam particles left in the gap after the main injection pulse.
- Synchronize kicker pulses with the beam cycle to target residual beam during the inter-bunch gap.
- Use a fast pulse generator and high-voltage switch to achieve sub-microsecond rise times for effective beam deflection.
- Integrate the kicker system with the beam abort system to safely extract and dispose of cleared beam particles.
- Perform commissioning and beam-based validation to confirm timing, amplitude, and beam loss reduction performance.
Experimental results
Research questions
- RQ1How effectively can a gap clearing kicker reduce localized beam loss in the Main Injector's injection region?
- RQ2What is the optimal timing and amplitude of the kicker pulse to clear residual beam without disturbing the main beam?
- RQ3Can the gap clearing kicker system be reliably integrated into the existing slip stacking operation without beam quality degradation?
- RQ4What is the measurable impact of the kicker on overall beam loss and operational stability at high beam power levels?
- RQ5How does the system perform under long-term operational conditions at high beam power?
Key findings
- The gap clearing kicker system was successfully installed in summer 2009 and became operational in November 2010.
- The system effectively reduced localized beam losses caused by residual particles in the injection gap during slip stacking.
- Beam loss measurements confirmed a significant reduction in loss rates at the injection region post-installation.
- The kicker system maintained beam quality and did not introduce new instabilities into the Main Injector beam.
- The system enabled stable high-power beam operation at the Main Injector since 2010, supporting ongoing physics programs.
- Performance validation confirmed the kicker’s timing accuracy and pulse fidelity under operational conditions.
Read this paper
Open the full text in the Nubint reader and ask about any passage as you read.
Read this paper on NubintThis review was generated by AI from the original paper. Please check the paper before citing it.