[Paper Review] A prototype optical link board with redundancy design for the ATLAS liquid argon calorimeter Phase-2 upgrade
This paper presents a prototype optical link board with redundancy for the ATLAS Liquid Argon Calorimeter Phase-2 upgrade, using 24 lpGBT chips and 8 VTRx+ modules to enable 22 simplex data links at 10.24 Gb/s and 2 duplex control links at 2.56/5.12 Gb/s. The design successfully verifies full data transmission and redundant control functionality, including clock distribution, I2C configuration, and reset operations, with BER < 10⁻¹² over 3 minutes at 10.24 Gb/s.
A prototype optical-link board has been developed for the ATLAS Liquid Argon Calorimeter Phase-2 upgrade. The board consists of 24 lpGBT chips and 8 VTRx+ modules and demonstrates the full optical link design of the future front-end board. The board has 22 simplex optical links to transmit detector data, which are emulated in FPGAs and injected through 6 FMC connectors, to the off-detector electronics. The board implements 2 duplex optical links for clocks, control, and monitoring with redundant design to improve the system reliability. Data transmission and all redundant designs have been verified. A fiber routing scheme, in which 2 or 3 VTRx+ modules are re-connected to the front panel with an MPO connector, has been prototyped.
Motivation & Objective
- To develop a prototype optical link board that emulates the full optical link functionality of the future ATLAS Liquid Argon Calorimeter front-end board (FEB2) for the Phase-2 upgrade.
- To verify high-speed data transmission (10.24 Gb/s) over 22 simplex optical links using FPGAs and FMC connectors.
- To implement and validate a redundant control link architecture for clocks, I2C configuration, BCR signals, and system monitoring to enhance system reliability.
- To prototype and evaluate a novel fiber routing scheme using MPO connectors to connect 2–3 VTRx+ modules directly to the front panel, reducing complexity and insertion loss.
- To ensure radiation tolerance and system robustness under HL-LHC conditions, including TID of 2.25 kGy and NIEL fluence of 4.9 × 10¹³ neq/cm².
Proposed method
- The prototype board integrates 24 lpGBT chips (22 for data, 2 for control) and 8 VTRx+ modules, with 22 simplex data links operating at 10.24 Gb/s and 2 duplex control links at 2.56 Gb/s (downstream) and 5.12 Gb/s (upstream).
- Detector data are emulated in FPGAs and injected via 6 FMC connectors, simulating real-time data transmission from the front-end electronics.
- Redundant control functionality is implemented using dual control lpGBTs (12 and 13), with primary and secondary I2C controllers, and bidirectional communication between FEB halves.
- Clock distribution redundancy is achieved by enabling lpGBT 12 to supply 40-MHz clocks to lpGBT 13 via RefClk pin and control its configuration via general-purpose I/O pins.
- I2C configuration redundancy is implemented by enabling secondary I2C controllers (lpGBTs 10 and 11) to take over in case of failure of primary links.
- System-level redundancy is validated through testing of BCR signal distribution, ASIC reset, and power cycling, with all functions verified via single-link operation.
Experimental results
Research questions
- RQ1Can a prototype optical link board successfully emulate the full data and control link functionality of the future ATLAS LAr Calorimeter FEB2?
- RQ2What is the bit error rate (BER) performance of the 10.24 Gb/s data links under sustained operation, and does it meet the required reliability threshold?
- RQ3Can redundant control links maintain system functionality (clocks, I2C, BCR, resets) when a primary link or optical module fails?
- RQ4What is the performance and feasibility of a novel fiber routing scheme using 2–3 VTRx+ modules connected via a single MPO connector to the front panel?
- RQ5How does the system maintain reliability under high-radiation conditions typical of the HL-LHC environment?
Key findings
- All 22 simplex data links achieved a bit error rate (BER) of less than 10⁻¹² at 10.24 Gb/s over a 3-minute test, corresponding to a confidence level of 84%.
- The redundant control link design successfully maintained clock distribution, I2C configuration, and BCR signal delivery even when one downstream control link was unplugged.
- The I2C configuration redundancy was verified: secondary controllers (lpGBTs 10 and 11) successfully took over control of the I2C buses after failure of the primary link.
- The crossover reset and power cycle functionality between lpGBT 12 and 13 was successfully tested, confirming that either chip can reset or power cycle the other.
- The prototype fiber routing scheme with 2–3 VTRx+ modules reconnected to the front panel via a single MPO connector was successfully demonstrated, reducing insertion loss and mechanical complexity.
- The board’s design, including layer stack and material (EM-888K), is compatible with the future FEB2, enabling direct integration into the final front-end electronics.
Read this paper
Open the full text in the Nubint reader and ask about any passage as you read.
Read this paper on NubintThis review was generated by AI from the original paper. Please check the paper before citing it.