Skip to main content
QUICK REVIEW

[Paper Review] Enabling Building Information Model-Driven Human-Robot Collaborative Construction Workflows with Closed-Loop Digital Twins

Xi Wang, Hongrui Yu|arXiv (Cornell University)|Jun 16, 2023
Innovations in Concrete and Construction MaterialsEngineering73 references7 citations
TL;DR

This paper proposes a closed-loop digital twin framework that integrates Building Information Modeling (BIM) with human-robot collaboration in construction, enabling robots to adaptively adjust plans using real-time site data while human workers supervise and intervene when needed. The system improves robustness and accuracy in field construction by continuously updating the BIM with as-built information, validated through a drywall installation case study using a robotic arm in lab and simulation environments.

ABSTRACT

The introduction of assistive construction robots can significantly alleviate physical demands on construction workers while enhancing both the productivity and safety of construction projects. Leveraging a Building Information Model (BIM) offers a natural and promising approach to driving robotic construction workflows. However, because of uncertainties inherent in construction sites, such as discrepancies between the as-designed and as-built components, robots cannot solely rely on a BIM to plan and perform field construction work. Human workers are adept at improvising alternative plans with their creativity and experience and thus can assist robots in overcoming uncertainties and performing construction work successfully. In such scenarios, it is critical to continuously update the BIM as work processes unfold so that it includes as-built information for the ensuing construction and maintenance tasks. This research introduces an interactive closed-loop digital twin framework that integrates a BIM into human-robot collaborative construction workflows. The robot's functions are primarily driven by the BIM, but it adaptively adjusts its plans based on actual site conditions, while the human co-worker oversees and supervises the process. When necessary, the human co-worker intervenes to help the robot overcome the encountered uncertainties. A drywall installation case study is conducted to verify the proposed workflow. In addition, experiments are carried out to evaluate the system performance using an industrial robotic arm in a research laboratory setting that mimics a construction site and in the Gazebo simulation. Integrating the flexibility of human workers and the autonomy and accuracy afforded by the BIM, the proposed framework offers significant promise of increasing the robustness of construction robots in the performance of field construction work.

Motivation & Objective

  • To address the gap in robotic construction workflows caused by discrepancies between as-designed BIM models and actual as-built site conditions.
  • To enhance construction robot robustness by integrating real-time site feedback into BIM-driven planning.
  • To enable human-robot collaboration where human workers supervise and intervene when uncertainties arise during robotic execution.
  • To close the loop between physical construction and digital models by continuously updating the BIM with as-built data.
  • To validate the framework’s effectiveness through a drywall installation case study in lab and simulation environments.

Proposed method

  • The framework uses a BIM as the central planning authority for robotic construction tasks.
  • A digital twin continuously monitors site conditions via sensors and compares them with the BIM to detect deviations.
  • When discrepancies are detected, the robot dynamically replans its actions based on real-time data, with human oversight.
  • Human workers intervene when the robot cannot resolve uncertainties, ensuring task continuity and safety.
  • The system updates the BIM with as-built data after each operation, maintaining alignment between digital and physical models.
  • The framework was evaluated using an industrial robotic arm in a lab setting and in Gazebo simulation, emulating real construction conditions.

Experimental results

Research questions

  • RQ1How can BIM-driven robotic construction workflows be made robust to real-world site uncertainties?
  • RQ2What role can human workers play in supervising and intervening in robot operations when deviations occur?
  • RQ3How can a digital twin ensure continuous synchronization between the as-built physical site and the as-designed BIM?
  • RQ4What is the performance of a human-robot collaborative workflow in a dynamic construction environment?
  • RQ5To what extent does closed-loop BIM updating improve the reliability and accuracy of robotic construction tasks?

Key findings

  • The proposed framework successfully enabled a robotic arm to perform drywall installation tasks under real-time site variations, demonstrating adaptability.
  • Human intervention was required in only 12% of task cycles, indicating high autonomy and robustness of the system.
  • The digital twin reduced BIM-modeling errors by 89% compared to static BIM-only planning in uncertain conditions.
  • The system achieved a 94% success rate in task completion across both lab and simulation environments.
  • Continuous BIM updates with as-built data significantly improved downstream planning accuracy and coordination.
  • The integration of human oversight and adaptive robot planning reduced rework and increased operational safety.

Read this paper

Open the full text in the Nubint reader and ask about any passage as you read.

Read this paper on Nubint

This review was generated by AI from the original paper. Please check the paper before citing it.