Skip to main content
QUICK REVIEW

[Paper Review] Intractability of Optimal Multi-Robot Path Planning on Planar Graphs

Jingjin Yu|arXiv (Cornell University)|Apr 8, 2015
Robotic Path Planning AlgorithmsComputer Science19 references16 citations
TL;DR

This paper proves that optimal multi-robot path planning on planar graphs is NP-complete for four common objectives—time and distance minimization under both total and maximum metrics—by reducing from 3SAT. The result establishes that efficient exact solutions are unlikely, advocating for environment engineering (e.g., highways, one-way paths) to reduce robot path conflicts in large-scale systems like warehouses or traffic networks.

ABSTRACT

We study the computational complexity of optimally solving multi-robot path planning problems on planar graphs. For four common time- and distance-based objectives, we show that the associated path optimization problems for multiple robots are all NP-complete, even when the underlying graph is planar. Establishing the computational intractability of optimal multi-robot path planning problems on planar graphs has important practical implications. In particular, our result suggests the preferred approach toward solving such problems, when the number of robots is large, is to augment the planar environment to reduce the sharing of paths among robots traveling in opposite directions on those paths. Indeed, such efficiency boosting structures, such as highways and elevated intersections, are ubiquitous in robotics and transportation applications.

Motivation & Objective

  • To determine the computational complexity of optimally solving multi-robot path planning problems on planar graphs.
  • To assess whether time- and distance-based optimality objectives for multiple robots can be solved efficiently in polynomial time.
  • To provide theoretical justification for engineering the environment (e.g., adding one-way paths or highways) to reduce path sharing and improve scalability.
  • To extend prior hardness results by considering general concurrent robot movements on planar graphs, not restricted to single-robot moves or grid-specific settings.

Proposed method

  • Reduces from the NP-complete 3SAT problem to construct a planar graph-based multi-robot path planning (PMPP) instance.
  • Designs specialized graph gadgets: variable channels, forward path gadgets, and clause robots to encode logical variables and clauses.
  • Uses unidirectional traversal constraints in gadgets to enforce consistent robot movement directions, ensuring shortest paths are unique and enforceable.
  • Constructs a distance-optimal solution by adjusting gadget sizes so all robots travel exactly the same minimal distance, enabling reduction to the minimum total or maximum distance problem.
  • Proves NP-hardness by showing that a satisfiable 3SAT assignment corresponds exactly to a distance-optimal robot path assignment.
  • Extends the construction to both total and maximum distance minimization objectives, proving NP-completeness for all four variants (time and distance, total and maximum).

Experimental results

Research questions

  • RQ1Is optimal multi-robot path planning on planar graphs computationally tractable for time- and distance-based objectives?
  • RQ2Can the problem be solved in polynomial time, or is it NP-complete?
  • RQ3Does the presence of concurrent robot movements and path sharing in planar graphs introduce inherent computational intractability?
  • RQ4Can the hardness result be extended to both total and maximum distance minimization objectives?
  • RQ5What are the practical implications of this intractability for robotics and transportation systems?

Key findings

  • The time-optimal multi-robot path planning problem on planar graphs (MTTPmpp) is NP-complete.
  • The maximum time-optimal problem (MMPmpp) is also NP-complete, even on planar graphs.
  • The total distance-optimal problem (MTDPmpp) is NP-complete, with all robots following shortest paths.
  • The maximum distance-optimal problem (MMDPmpp) is NP-complete, achieved by adjusting gadget sizes to equalize robot travel distances.
  • The hardness holds even when robots move concurrently and the graph is planar, with no restriction on the number of empty vertices.
  • The result implies that optimal solutions for large-scale multi-robot systems on planar environments are unlikely to be computed efficiently, justifying environment engineering as a preferred alternative.

Read this paper

Open the full text in the Nubint reader and ask about any passage as you read.

Read this paper on Nubint

This review was generated by AI from the original paper. Please check the paper before citing it.