This paper establishes tight lower bounds on the running time of approximation and exact algorithms for the classical identical machine scheduling problem to minimize makespan (P||C_max), under the Exponential Time Hypothesis (ETH). It proves that existing fully polynomial-time approximation schemes (FPTAS) and polynomial-time approximation schemes (PTAS) are essentially optimal, as improving their running times would refute ETH.
We consider the classical scheduling problem on parallel identical machines to minimize the makespan, and achieve the following results under the Exponential Time Hypothesis (ETH) 1. The scheduling problem on a constant number $m$ of identical machines, which is denoted as $Pm||C_{max}$, is known to admit a fully polynomial time approximation scheme (FPTAS) of running time $O(n) + (1/ε)^{O(m)}$ (indeed, the algorithm works for an even more general problem where machines are unrelated). We prove this algorithm is essentially the best possible in the sense that a $(1/ε)^{O(m^{1-δ})}+n^{O(1)}$ time FPTAS for any $δ>0$ implies that ETH fails. 2. The scheduling problem on an arbitrary number of identical machines, which is denoted as $P||C_{max}$, is known to admit a polynomial time approximation scheme (PTAS) of running time $2^{O(1/ε^2\log^3(1/ε))}+n^{O(1)}$. We prove this algorithm is nearly optimal in the sense that a $2^{O((1/ε)^{1-δ})}+n^{O(1)}$ time PTAS for any $δ>0$ implies that ETH fails, leaving a small room for improvement. To obtain these results we will provide two new reductions from 3SAT, one for $Pm||C_{max}$ and another for $P||C_{max}$. Indeed, the new reductions explore the structure of scheduling problems and can also lead to other interesting results. For example, using the framework of our reduction for $P||C_{max}$, Chen et al. (arXiv:1306.3727) is able to prove the APX-hardness of the scheduling problem in which the matrix of job processing times $P=(p_{ij})_{m imes n}$ is of rank 3, solving the open problem mentioned by Bhaskara et al. (SODA 2013).
Motivation & Objective
- To determine whether existing approximation and exact algorithms for identical machine scheduling are optimal in terms of running time.
- To investigate the limits of improvement for FPTAS and PTAS for the makespan minimization problem under the Exponential Time Hypothesis (ETH).
- To establish tight running time lower bounds for both constant and arbitrary numbers of machines.
- To develop new reductions from 3SAT to scheduling problems to prove these lower bounds.
Proposed method
- Proposes two novel reductions from 3SAT to the scheduling problems Pm||C_max and P||C_max, respectively, to establish ETH-based lower bounds.
- Uses the Exponential Time Hypothesis (ETH) to show that any significant improvement in running time for FPTAS or PTAS would imply a subexponential-time algorithm for 3SAT.
- Analyzes the dynamic programming algorithm for P||C_max by bounding the size of the state space ST_k using logarithmic and combinatorial arguments.
- Applies case analysis based on job processing time ranges to bound the number of distinct load vectors in the dynamic programming table.
- Leverages the Sparsification Lemma and ETH to derive non-trivial running time lower bounds for approximation schemes.
- Proves that even under restricted conditions (e.g., bounded job processing times), no subexponential-time exact algorithm exists unless ETH fails.
Experimental results
Research questions
- RQ1Is the known FPTAS for Pm||C_max with running time O(n) + (1/ε)^O(m) essentially optimal?
- RQ2Can the PTAS for P||C_max with running time 2^{O(1/ε² log³(1/ε))} + O(n^O(1)) be significantly improved in running time?
- RQ3Is the traditional O(2^n)-time dynamic programming algorithm for P||C_max optimal, even under restricted input conditions?
- RQ4Can the new 3SAT reductions to scheduling problems be used to resolve other open problems in scheduling complexity?
Key findings
- A (1/ε)^{O(m^{1−δ})} + n^{O(1)} time PTAS for Pm||C_max would imply that ETH fails, proving the known FPTAS is essentially optimal.
- A 2^{O((1/ε)^{1−δ})} + n^{O(1)} time PTAS for P||C_max would imply that ETH fails, showing the known PTAS is nearly optimal.
- An exact algorithm for P||C_max running in 2^{O(n^{1−δ})} time, even with job processing times bounded by O(n), would contradict ETH.
- The new reductions from 3SAT to scheduling problems are general enough to imply APX-hardness of rank-3 scheduling, resolving an open problem.
- The dynamic programming algorithm for P||C_max runs in 2^{O(√(m|I| log m) + m log|I|)} time, and this bound is tight under ETH.
- The framework developed in this paper provides a tool to prove APX-hardness for other low-rank scheduling problems, such as rank-3 scheduling.
Read this paper