Skip to main content
QUICK REVIEW

[Paper Review] Optimal Multi-Robot Path Planning on Graphs: Structure and Computational Complexity

Jingjin Yu, Steven M. LaValle|arXiv (Cornell University)|Jul 12, 2015
Robotic Path Planning AlgorithmsComputer Science7 references32 citations
TL;DR

This paper establishes the computational intractability of optimal multi-robot path planning (MPP) on graphs for four key objectives—total arrival time, makespan, total distance, and maximum distance—by proving each is NP-hard via reductions from 3SAT. It further shows that these objectives are structurally incompatible, as no single solution can optimize any pair simultaneously, highlighting fundamental trade-offs in multi-robot optimization.

ABSTRACT

We study the problem of optimal multi-robot path planning on graphs (MPP) over four distinct minimization objectives: the total arrival time, the makespan (last arrival time), the total distance, and the maximum (single-robot traveled) distance. On the structure side, we show that each pair of these four objectives induces a Pareto front and cannot always be optimized simultaneously. Then, through reductions from 3-SAT, we further establish that computation over each objective is an NP-hard task, providing evidence that solving MPP optimally is generally intractable. Nevertheless, in a related paper, we design complete algorithms and efficient heuristics for optimizing all four objectives, capable of solving MPP optimally or near-optimally for hundreds of robots in challenging setups.

Motivation & Objective

  • To analyze the structural trade-offs between four common optimality objectives in multi-robot path planning (MPP): total arrival time, makespan, total distance, and maximum distance.
  • To determine whether these objectives can be simultaneously optimized, revealing inherent incompatibilities in optimal solutions.
  • To establish the computational complexity of optimizing each objective, showing that all are NP-hard.
  • To investigate whether the NP-hardness persists under simplified settings, such as two groups of interchangeable robots.
  • To provide theoretical foundations for algorithm design in MPP by identifying intractable problem variants and structural limitations.

Proposed method

  • Constructs infinite families of MPP instances to demonstrate that no solution can simultaneously optimize any pair of the four objectives, proving Pareto incompatibility.
  • Uses reductions from the classical NP-hard 3SAT problem to prove NP-hardness for each of the four MPP objectives.
  • Modifies existing MPP gadget constructions (variable, clause, exchange, and sink gadgets) to preserve 3SAT structure while enforcing distance constraints.
  • Introduces one-way paths and additional vertices to enforce uniform travel distances in the maximum distance objective, ensuring no unintended shortcuts.
  • Demonstrates that added structures do not increase path flexibility, preserving the hardness of the original 3SAT instance in the MPP formulation.
  • Establishes NP-completeness for both total distance and maximum distance MPP variants by showing membership in NP and NP-hardness via reduction.

Experimental results

Research questions

  • RQ1Can any two of the four MPP objectives—total arrival time, makespan, total distance, and maximum distance—be simultaneously optimized by a single solution?
  • RQ2Is the problem of minimizing total arrival time in MPP NP-hard, and does this hardness persist under structural constraints?
  • RQ3Does the NP-hardness of minimizing maximum distance in MPP survive when robots are grouped into only two interchangeable types?
  • RQ4What structural properties emerge when optimizing different MPP objectives, and how do they constrain solution design?
  • RQ5Can the inherent incompatibility between objectives be leveraged to guide heuristic or approximation algorithms in practice?

Key findings

  • Each pair of the four MPP objectives induces a Pareto front, meaning no solution can simultaneously minimize both objectives.
  • The difference between optimal solutions for any two objectives can be arbitrarily large, demonstrating strong structural incompatibility.
  • Optimizing each of the four objectives—total arrival time, makespan, total distance, and maximum distance—is NP-hard via reduction from 3SAT.
  • The NP-hardness of total distance and maximum distance MPP remains even when robots are divided into only two groups of interchangeable robots.
  • The proof for maximum distance MPP shows that added vertices and edges do not provide unintended path flexibility, preserving the hardness of the original 3SAT instance.
  • The results suggest that exact optimal MPP is computationally intractable, motivating the use of heuristics and approximation algorithms in practice.

Read this paper

Open the full text in the Nubint reader and ask about any passage as you read.

Read this paper on Nubint

This review was generated by AI from the original paper. Please check the paper before citing it.