TL;DR

This paper proposes an AC power flow-based cascading failure model that explicitly incorporates extreme temperature disturbances, modeling their effects on load demand, dynamic line ratings, and correlated outages of transmission lines and generators. The key contribution is demonstrating that temperature-induced correlations significantly increase cascading failure and voltage instability risks, with critical thresholds identified for temperature change and affected area size, while control strategies like load shedding and re-dispatch effectively reduce risk.

ABSTRACT

In this paper, we propose an AC power flow based cascading failure model that explicitly considers external weather conditions, extreme temperatures in particular, and evaluates the impact of extreme temperature on the initiation and propagation of cascading blackouts. Specifically, load and dynamic line rating changes are modeled due to temperature disturbance, the probabilities for transmission line and generator outages are evaluated, and the timing for each type of events is carefully calculated to decide the actual event sequence. It should be emphasized that the correlated events, in the advent of external temperature changes, could together contribute to voltage instability. Besides, we model undervoltage load shedding and operator re-dispatch as control strategies for preventing the propagation of cascading failures. The effectiveness of the proposed model is verified by simulation results on the RTS-96 3-area system and it is found that temperature disturbances can lead to correlated load change and line/generator tripping, which together will greatly increase the risk of cascading and voltage instability. Critical temperature change, critical area with temperature disturbance, identification of most vulnerable buses, and comparison of different control strategies are also carefully investigated.

Motivation & Objective

  • To develop a cascading failure model that explicitly accounts for extreme temperature disturbances and their impact on system components.
  • To analyze how temperature-induced load changes and dynamic line ratings correlate with transmission line and generator outages.
  • To investigate the role of voltage instability in cascading failure propagation under thermal stress.
  • To evaluate the effectiveness of control strategies such as undervoltage load shedding and operator re-dispatch in mitigating cascading risks.
  • To identify critical temperature changes, vulnerable areas, and the most vulnerable buses in the power system.

Proposed method

  • The model uses AC power flow to simulate system behavior under extreme temperature conditions.
  • Temperature-dependent load growth and dynamic line rating (DLR) changes are modeled based on ambient temperature variations.
  • Probabilities of transmission line and generator outages are calculated based on thermal and voltage stability thresholds.
  • Event timing is determined by simulating the sequence of line outages, generator tripping, and voltage collapse using time-stamped event resolution.
  • Control strategies—undervoltage load shedding and operator re-dispatch—are modeled with dynamic line ratings to assess their impact on failure propagation.
  • The model is validated on the RTS-96 3-area system using 10,000 Monte Carlo simulations across diverse temperature and area disturbance scenarios.

Experimental results

Research questions

  • RQ1How do extreme temperature disturbances initiate and propagate cascading failures in power systems?
  • RQ2What is the correlation between temperature-induced load growth, dynamic line rating changes, and component outages?
  • RQ3What are the critical temperature changes and affected area sizes that significantly increase cascading failure risk?
  • RQ4Which buses are most vulnerable to temperature disturbances in terms of outage frequency and load shedding?
  • RQ5How effective are control strategies like load shedding and operator re-dispatch in preventing cascading failures under thermal stress?

Key findings

  • A critical temperature increase of 11°C was found to significantly elevate cascading failure risk, especially when combined with large affected areas.
  • The critical area size for triggering a substantial increase in outages was identified as γ = 0.07, corresponding to approximately 7% of the total system area.
  • Buses 208, 308, 305, 210, 209, 306, 309, and 310 were identified as the most vulnerable, showing higher outage frequency and load shedding under temperature disturbances.
  • Operator re-dispatch based on dynamic line ratings reduced the number of line and generator outages more effectively than re-dispatch using initial ratings.
  • The inclusion of dynamic line ratings in re-dispatch strategies led to a significantly greater reduction in cascading failure risk compared to static ratings.
  • Correlated events—such as simultaneous load growth, line tripping, and voltage collapse—were shown to be key drivers of cascading failure under extreme temperatures.

Read this paper

Open the full text in the Nubint reader and ask about any passage as you read.

Read this paper on Nubint

This review was generated by AI from the original paper. Please check the paper before citing it.