Skip to main content
QUICK REVIEW

[Paper Review] Scheduling to Minimize Total Weighted Completion Time via Time-Indexed Linear Programming Relaxations

Shi Li|arXiv (Cornell University)|Jul 25, 2017
Scheduling and Optimization AlgorithmsEngineering26 references5 citations
TL;DR

This paper presents improved approximation algorithms for scheduling to minimize total weighted completion time using time-indexed linear programming relaxations, achieving a (1.5−c)-approximation for unrelated machine scheduling—matching a recent breakthrough result but via a simpler, more natural LP relaxation. The approach leverages fractional scheduling to refine analysis and overcome long-standing approximation barriers in precedence-constrained and related machine models.

ABSTRACT

We study approximation algorithms for scheduling problems with the objective of minimizing total weighted completion time, under identical and related machine models with job precedence constraints. We give algorithms that improve upon many previous 15 to 20-year-old state-of-art results. A major theme in these results is the use of time-indexed linear programming relaxations. These are natural relaxations for their respective problems, but surprisingly are not studied in the literature. We also consider the scheduling problem of minimizing total weighted completion time on unrelated machines. The recent breakthrough result of [Bansal-Srinivasan-Svensson, STOC 2016] gave a $(1.5-c)$-approximation for the problem, based on some lift-and-project SDP relaxation. Our main result is that a $(1.5 - c)$-approximation can also be achieved using a natural and considerably simpler time-indexed LP relaxation for the problem. We hope this relaxation can provide new insights into the problem.

Motivation & Objective

  • To develop improved approximation algorithms for scheduling problems with total weighted completion time objectives under various machine models.
  • To address the long-standing lack of progress in approximating scheduling problems with precedence constraints and non-uniform job sizes.
  • To demonstrate that time-indexed LP relaxations—previously underexplored—can yield strong approximation guarantees.
  • To match or improve upon the (1.5−c)-approximation for unrelated machines, previously achieved only via complex lift-and-project SDP relaxations.
  • To provide new insights into the structure of weighted completion time scheduling through simpler, more intuitive LP formulations.

Proposed method

  • Formulate time-indexed linear programming relaxations that assign fractional processing times to jobs across machines and time slots.
  • Use the fractional solution to guide a job-driven list-scheduling algorithm, prioritizing jobs based on $ C_j - p_j/2 $ values.
  • Apply a randomized rounding scheme with probabilistic analysis to bound expected completion times.
  • Introduce a negative correlation argument between jobs to analyze the probability of scheduling conflicts and delays.
  • Use interval decomposition and geometric grouping (e.g., $ 2^a $-level intervals) to bound contributions of different job sizes.
  • Decondition on machine-specific events to derive global expected completion time bounds.

Experimental results

Research questions

  • RQ1Can time-indexed LP relaxations outperform or simplify existing approximation algorithms for total weighted completion time scheduling?
  • RQ2Is it possible to achieve a (1.5−c)-approximation for unrelated machine scheduling using a natural LP relaxation instead of complex SDP methods?
  • RQ3How can fractional scheduling solutions be leveraged to improve the analysis of existing approximation algorithms?
  • RQ4What is the role of precedence constraints in limiting or enabling better approximation ratios?
  • RQ5Can super-polynomial time ranges in scheduling be handled efficiently while preserving approximation guarantees?

Key findings

  • A (1.5−c)-approximation algorithm is achieved for unrelated machine scheduling using a time-indexed LP relaxation, matching the best-known result from a more complex SDP approach.
  • The time-indexed LP relaxation is shown to be powerful and underutilized, offering a simpler alternative to lift-and-project SDP relaxations.
  • For identical machines with precedence constraints, the paper improves upon the 7-approximation of Hall et al. and the 4-approximation of Munier et al., though the exact new ratio is not explicitly stated.
  • The analysis reveals that the fractional solution can identify and correct loose bounds in prior algorithms, leading to tighter performance guarantees.
  • The method handles super-polynomial time ranges efficiently by adapting techniques from prior work, ensuring polynomial-time solvability.
  • The expected completion time of each job is bounded by $ (1.5 - 1/6000)( ext{LP completion time}) $, proving a $ (1.5 - 1/6000) $-approximation.

Read this paper

Open the full text in the Nubint reader and ask about any passage as you read.

Read this paper on Nubint

This review was generated by AI from the original paper. Please check the paper before citing it.