[Paper Review] Scheduling with Locality by Routing

Liu, Alison Hsiang-Hsuan, Liu, Fu-Hong|arXiv (Cornell University)|May 11, 2014
Scheduling and Optimization AlgorithmsEngineering1 citations
TL;DR

This paper presents a polynomial-time algorithm for minimizing makespan on unrelated parallel machines with improved approximation ratios for instances possessing a high feasibility factor—defined as the minimum fraction of machines capable of processing each job. By leveraging machine load balancing via augmenting paths in a bipartite graph, the method achieves a makespan bound of T + L/h < 2T, significantly improving upon the classic 2-approximation for highly feasible instances, and further refining the bound to 1 + q/h for the restricted assignment problem.

ABSTRACT

This work examines a strongly NP-hard routing problem on trees, in which multiple servers need to serve a given set of requests (on vertices), where the routes of the servers start from a common source and end at their respective terminals. Each server can travel free of cost on its source-to-terminal path but has to pay for travel on other edges. The objective is to minimize the maximum cost over all servers. As the servers may pay different costs for traveling through a common edge, balancing the loads of the servers can be difficult. We propose a polynomial-time 4-approximation algorithm that applies the parametric pruning framework but consists of two phases. The first phase of the algorithm partitions the requests into packets, and the second phase of the algorithm assigns the packets to the servers. Unlike the standard parametric pruning techniques, the challenge of our algorithm design and analysis is to harmoniously relate the quality of the partition in the first phase, the balances of the servers' loads in the second phase, and the hypothetical optimal values of the framework. For the problem in general graphs, we show that there is no algorithm better than 2-approximate unless P = NP. The problem is a generalization of unrelated machine scheduling and other classic scheduling problems. It also models scheduling problems where the job processing times depend on the machine serving the job and the other jobs served by that machine. This modeling provides a framework that physicalizes scheduling problems through the graph’s point of view.

Motivation & Objective

  • To improve the longstanding 2-approximation bound for makespan minimization on unrelated machines, which has not advanced in over 20 years.
  • To identify a wide subclass of scheduling instances—characterized by a high feasibility factor—where tighter approximation ratios are achievable.
  • To develop a polynomial-time algorithm that either proves infeasibility or computes a schedule with makespan strictly less than 2T.
  • To refine the approximation ratio for the restricted assignment problem, improving upon the 33/17 + ε bound for highly feasible instances.
  • To provide a more efficient algorithm than prior flow-based methods by eliminating binary search over the solution space.

Proposed method

  • Define the feasibility factor h as the minimum fraction of machines capable of processing each job, enabling classification of instances by feasibility.
  • Use a linear programming relaxation and rounding technique to derive a schedule with makespan at most T + L/h, where L is the mean machine completion time.
  • Construct a bipartite graph Gα(w) representing machine-job assignments and augmenting paths to rebalance loads.
  • Apply the UBF algorithm (from Gairing et al.) to iteratively reassign jobs from overloaded machines (M+) to underloaded ones (M−) via augmenting paths.
  • Partition machines into M−, M0, and M+ based on load relative to L/h and w = pmax to guide the reassignment process.
  • Prove termination with M+ = ∅ using a contradiction argument based on average load and feasibility factor h, ensuring convergence to a low-makespan schedule.

Experimental results

Research questions

  • RQ1Can the classic 2-approximation bound for unrelated machine scheduling be improved for a broad subclass of instances?
  • RQ2To what extent does a high feasibility factor h enable tighter makespan bounds than the general 2-approximation?
  • RQ3Can the restricted assignment problem achieve a better approximation ratio than 33/17 + ε for highly feasible instances?
  • RQ4Is there a more efficient algorithm than binary search-based approaches for achieving near-optimal makespan in restricted scheduling?
  • RQ5What structural properties of the feasibility factor h allow for improved approximation guarantees in scheduling?

Key findings

  • For any instance with feasibility factor h ≥ L/T, the algorithm computes a schedule with makespan at most T + L/h < 2T, improving upon the classic 2-approximation.
  • For the restricted assignment problem, the algorithm achieves a (1 + q/h)-approximation ratio, where q = L/pmax, which is strictly less than 2 when h > q.
  • The algorithm runs in O(mS) time, where S = Σj |{i : pij < ∞}|, and is faster than the O(mS log W) binary search-based method of Gairing et al.
  • The proof of correctness relies on a contradiction argument showing that if M+ is non-empty, the average load would exceed L, violating the invariant of the algorithm.
  • The feasibility factor h serves as a key parameter enabling tighter bounds, with higher h leading to significantly improved approximation ratios.
  • The method improves upon Svensson’s 33/17 + ε bound for highly feasible instances, achieving a better ratio of 1 + q/h for the restricted case.

Read this paper

Open the full text in the Nubint reader and ask about any passage as you read.

Read this paper on Nubint

This review was generated by AI from the original paper. Please check the paper before citing it.