[Paper Review] Solution of a bilevel optimistic scheduling problem on parallel machines

Quentin Schau, Olivier Ploton|arXiv (Cornell University)|Mar 5, 2026
Optimization and Variational AnalysisComputer Science0 citations
TL;DR

This paper studies a bilevel optimistic scheduling problem on uniform parallel machines with two speeds, proving strong NP-hardness and proposing a MIP, a branch-and-bound algorithm with column generation, and a dynamic programming approach.

ABSTRACT

We consider the uniform parallel machines scheduling problem in the context of optimistic bilevel optimization, where two speed options are considered. In this scenario, the leader aims to minimize the weighted number of tardy jobs, while the follower seeks to minimize the total completion time on a set of uniform machines. This problem has practical applications in Industry 4.0. We show that this problem is NP-hard in the strong sense by providing a reduction from the Numerical 3-Dimensional Matching problem and we provide a moderately exponential-time dynamic programming algorithm. The problem is solved by means of a concise MIP formulation and a branch-and-bound algorithm that embeds a column generation approach for the lower bound computation. Computational experiments are presented for instances with up to 80 jobs and 4 machines while larger problems are out of reach for the proposed approaches.

Motivation & Objective

  • Understand the complexity and structure of a bilevel optimistic scheduling problem on uniform parallel machines with two speeds.
  • Develop exact solution methods (MIP, branch-and-bound with column generation) and a dynamic programming approach for tractable instances.
  • Provide complexity proofs to clarify the problem's hardness and identify algorithmic strategies for practical instance sizes.
  • Offer insights into how maintenance decisions (machine speeds) interact with follower scheduling to minimize tardiness and total completion time.

Proposed method

  • Formulate the bilevel problem where the leader selects a subset of jobs and the follower minimizes total completion time under two machine speeds.
  • Show the follower problem is optimizable with a block structure leading to an O(n log n) solution for two speeds under certain processing-time assumptions.
  • Develop a concise mixed-integer programming (MIP) model with O(N(n+m)) variables and O(N^2 + Nm^2) constraints to capture the bilevel problem.
  • Embed a branch-and-bound algorithm that integrates a column generation approach to compute a strong lower bound for the follower's problem.
  • Propose a moderately exponential-time dynamic programming algorithm based on the block structure to handle the bilevel problem when the number of machines m is fixed.
  • Utilize reductions from NUM-3DM to establish strong NP-hardness and demonstrate NP-hardness in the strong sense for the bilevel formulation.

Experimental results

Research questions

  • RQ1Is the bilevel optimistic scheduling problem on uniform parallel machines (with two speeds) strongly NP-hard?
  • RQ2Can the problem be solved exactly via a compact MIP formulation and a branch-and-bound approach with column generation for lower bounds?
  • RQ3What is the computational tractability of the follower's problem, and can dynamic programming exploit the two-speed block structure?
  • RQ4How does the problem scale with instance size (jobs, machines) and what are the practical limits for exact solution methods?

Key findings

  • The bilevel optimistic scheduling problem with two speeds is strongly NP-hard.
  • A polynomial-time reduction from Numerical 3-Dimensional Matching proves hardness for the bilevel formulation.
  • The follower's problem is solvable in O(n log n) time for two speeds, and remains NP-hard in the general case with arbitrary processing times.
  • A concise MIP formulation with polynomially many variables/constraints models the bilevel problem.
  • A branch-and-bound algorithm with a column generation lower bound significantly aids solving instances up to 80 jobs and 4 machines; larger instances remain challenging.
  • A moderately exponential-time dynamic programming approach is proposed for fixed numbers of machines, exploiting the block structure of optimal schedules.

Read this paper

Open the full text in the Nubint reader and ask about any passage as you read.

Read this paper on Nubint

This review was generated by AI from the original paper. Please check the paper before citing it.