This paper details the design, construction, and operational plans for the Advanced Superconducting Test Accelerator (ASTA) at Fermilab, a 750-MeV electron beam facility using ILC-type cryomodules that can be upgraded to 1.5 GeV. The facility supports testing of superconducting RF components, RF power systems, diagnostics, and control systems for future projects like the ILC and Project-X, with dedicated cryoplant and test stands built adjacent to the main site.

ABSTRACT

The Advanced Superconducting Test Acccelerator (ASTA) is being constructed at Fermilab. The existing New Muon Lab (NML) building is being converted for this facility. The accelerator will consist of an electron gun, injector, beam acceleration section consisting of 3 TTF-type or ILC-type cryomodules, multiple downstream beamlines for testing diagnostics and conducting various beam tests, and a high power beam dump. When completed, it is envisioned that this facility will initially be capable of generating a 750-MeV electron beam with ILC beam intensity. An expansion of this facility was recently completed that will provide the capability to upgrade the accelerator to a total beam energy of 1.5-GeV. Two new buildings were also constructed adjacent to the ASTA facility to house a new cryogenic plant and multiple superconducting RF (SRF) cryomodule test stands. In addition to testing accelerator components, this facility will be used to test RF power systems, instrumentation, and control systems for future SRF accelerators such as the ILC and Project-X. This paper describes the current status and overall plans for this facility.

Motivation & Objective

  • To establish a dedicated test facility for superconducting RF (SRF) components and systems critical for future accelerators like the ILC and Project-X.
  • To address the need for integrated testing of SRF cryomodules, RF power systems, and beam diagnostics under realistic conditions.
  • To upgrade the existing New Muon Lab building into a modern accelerator test facility with high beam energy and power capabilities.
  • To support the development and validation of control systems and instrumentation for next-generation SRF accelerators.
  • To provide a scalable infrastructure with adjacent cryoplant and test stands for long-term R&D in superconducting accelerator technology.

Proposed method

  • Conversion of the existing New Muon Lab (NML) building into the ASTA facility to house the accelerator and beamlines.
  • Integration of three TTF- or ILC-type cryomodules for beam acceleration, enabling initial 750-MeV operation.
  • Design of multiple downstream beamlines to support diagnostics testing and various beam experiments.
  • Construction of two new adjacent buildings to house a dedicated cryogenic plant and multiple SRF cryomodule test stands.
  • Implementation of a high-power beam dump to enable safe operation at full beam intensity.
  • Use of standardized ILC-type components to ensure compatibility with future large-scale accelerator projects.

Experimental results

Research questions

  • RQ1What is the optimal configuration for a high-intensity, high-energy superconducting RF test facility at Fermilab?
  • RQ2How can a modular and scalable design support both current and future SRF accelerator R&D needs?
  • RQ3What infrastructure is required to enable integrated testing of cryomodules, RF systems, and diagnostics in a single facility?
  • RQ4How can beam energy be upgraded from 750 MeV to 1.5 GeV while maintaining system reliability and safety?
  • RQ5What role do dedicated cryoplant and test stands play in enabling continuous development of SRF components?

Key findings

  • The ASTA facility is being constructed in the converted New Muon Lab building, with initial beam energy capability of 750 MeV using three ILC-type cryomodules.
  • An expansion of the facility has been completed, enabling a future upgrade to a total beam energy of 1.5 GeV.
  • Two new buildings have been constructed adjacent to ASTA to house a dedicated cryogenic plant and multiple SRF cryomodule test stands.
  • The facility supports comprehensive testing of SRF components, RF power systems, instrumentation, and control systems for future accelerators.
  • The ASTA facility is designed to support beam tests at ILC beam intensity levels, ensuring compatibility with major international projects.
  • The integration of beamlines, diagnostics, and a high-power beam dump enables safe and versatile operation for advanced R&D.

Read this paper

Open the full text in the Nubint reader and ask about any passage as you read.

Read this paper on Nubint

This review was generated by AI from the original paper. Please check the paper before citing it.