[Paper Review] The Compact Linear e$^+$e$^-$ Collider (CLIC): Accelerator and Detector
The Compact Linear e⁺e⁻ Collider (CLIC) is a multi-TeV, high-luminosity linear collider under development at CERN, using a two-beam acceleration scheme with normal-conducting 12 GHz structures powered by a drive beam, achieving 170 MW power consumption and a cost estimate of 6 billion CHF for its 380 GeV first stage. It enables precision measurements in the Higgs and top-quark sectors and direct searches for new physics, with first beams expected by 2035 and construction starting in 2026.
The Compact Linear Collider (CLIC) is a TeV-scale high-luminosity linear e$^+$e$^-$ collider under development by international collaborations hosted by CERN. This document provides an overview of the design, technology, and implementation aspects of the CLIC accelerator and the detector. For an optimal exploitation of its physics potential, CLIC is foreseen to be built and operated in stages, at centre-of-mass energies of 380 GeV, 1.5 TeV and 3 TeV, for a site length ranging between 11 km and 50 km. CLIC uses a two-beam acceleration scheme, in which normal-conducting high-gradient 12 GHz accelerating structures are powered via a high-current drive beam. For the first stage, an alternative with X-band klystron powering is also considered. CLIC accelerator optimisation, technical developments, and system tests have resulted in significant progress in recent years. Moreover, this has led to an increased energy efficiency and reduced power consumption of around 170 MW for the 380 GeV stage, together with a reduced cost estimate of approximately 6 billion CHF. The detector concept, which matches the physics performance requirements and the CLIC experimental conditions, has been refined using improved software tools for simulation and reconstruction. Significant progress has been made on detector technology developments for the tracking and calorimetry systems. The construction of the first CLIC energy stage could start as early as 2026 and first beams would be available by 2035, marking the beginning of a physics programme spanning 25-30 years and providing excellent sensitivity to Beyond Standard Model physics, through direct searches and via a broad set of precision measurements of Standard Model processes, particularly in the Higgs and top-quark sectors.
Motivation & Objective
- To develop a mature, cost-effective, and energy-efficient multi-TeV e⁺e⁻ collider for precision Standard Model and new physics measurements beyond the LHC.
- To optimize the CLIC accelerator design for staged operation at 380 GeV, 1.5 TeV, and 3 TeV, balancing luminosity, cost, and energy efficiency.
- To refine the CLIC detector concept (CLICdet) for high-precision particle flow reconstruction under intense beam-induced backgrounds.
- To validate critical technologies—such as high-gradient accelerating structures, low-emittance electron beams, and high-granularity calorimeters—through beam tests and prototypes.
- To establish a realistic implementation roadmap for CLIC at CERN, including civil engineering, infrastructure, and industrial development, with construction starting in 2026.
Proposed method
- CLIC employs a two-beam acceleration scheme, using a high-current drive beam to power normal-conducting 12 GHz accelerating structures operating at 70–100 MV/m gradients.
- The first stage uses a 380 GeV center-of-mass energy, with an alternative X-band klystron-based powering option studied for initial operation.
- Accelerator optimization is performed via full parameter space scans, using luminosity, cost, and energy consumption as key performance metrics.
- Detector design (CLICdet) is optimized for particle flow reconstruction with a lightweight vertex and tracker, highly granular calorimeters, and a 4 T solenoid.
- System-level integration includes final focusing quadrupoles placed outside the detector, and advanced simulation/reconstruction software tools are used to refine performance.
- Technology validation is achieved through large-scale beam tests at CTF3, X-band test platforms, and FEL linac facilities, demonstrating sub-nanometre stability and high-gradient performance.
Experimental results
Research questions
- RQ1Can a two-beam acceleration scheme achieve the required accelerating gradients (70–100 MV/m) and stable breakdown rates below 3×10⁷ m⁻¹ per pulse at 12 GHz?
- RQ2What is the optimal staging strategy for CLIC in terms of center-of-mass energy, luminosity, cost, and energy efficiency across 380 GeV, 1.5 TeV, and 3 TeV stages?
- RQ3Can the required beam parameters—especially sub-nanometre emittance and stability—be achieved using existing light-source and FEL technologies?
- RQ4Can the detector concept (CLICdet) achieve the necessary particle flow reconstruction performance under high beam-induced background conditions?
- RQ5What are the realistic cost and power consumption estimates for the 380 GeV stage, and can they be reduced to ~6 billion CHF and 170 MW, respectively?
Key findings
- The 380 GeV stage of CLIC achieves an estimated power consumption of 170 MW and a cost of approximately 6 billion CHF, significantly reduced from earlier estimates.
- Accelerating gradients of up to 145 MV/m have been achieved in two-beam beam tests at CTF3, confirming the feasibility of the core acceleration scheme.
- Breakdown rates in X-band test structures are well below the 3×10⁷ m⁻¹ limit, demonstrating stable operation under high-gradient conditions.
- Sub-nanometre beam stability and low emittance in damping rings have been validated using modern synchrotron light sources and FEL facilities.
- The CLICdet detector concept is optimized for particle flow, with improved angular acceptance and performance in simulation, supported by validated technology demonstrators for vertex, tracking, and calorimetry systems.
- The implementation plan foresees a five-year preparation phase ending in 2025, with construction starting in 2026 and first beams available by 2035, enabling a 25–30 year physics program.