TL;DR

This paper presents a VHDL firmware core, the Readout Supervisor, designed to synchronize and control the upgraded LHCb detector's readout system for 40 MHz bunch crossing operation. It enables precise timing distribution, event building, and configurable control for calibration and varying running conditions, achieving full synchronization across all readout components with real-time logic in a fully configurable framework for the LHCb experiment's 2019 upgrade.

ABSTRACT

In 2019, the LHCb experiment at CERN will undergo a major upgrade where its detector electronics and the entire readout system will be replaced. The goal is to read-out all events at the full LHC frequency of 40 MHz, reaching a total data rate of ~40 Tb/s. In this context, a new timing, trigger and readout control system has been developed: its main tasks are to distribute centrally the clock, the timing information and to synchronize all elements in the readout system: from the very last Front-End ASIC to the building of events to be stored. The heart of the timing and readout control system is a VHDL firmware core that is now finalized and currently in use in test-benches and test-beams by the upgraded sub-detectors, for their initial commissioning phase. Such firmware core is able to generate all necessary processes to keep the synchronization of all readout elements with the LHC bunch crossing as well as it is able to generate asynchronous commands for calibration or test purposes. It is also able to accommodate for specific recipes to handle varying running conditions, by using a generic and fully configurable approach. In this paper, the philosophy and the implementation behind such firmware are described in details, posing particular emphasis to the real-time logical processes that were developed in order to satisfy the requirements of synchronization and readout control of the upgraded LHCb detector.

Motivation & Objective

  • To develop a centralized timing, trigger, and readout control system for the upgraded LHCb detector operating at 40 MHz.
  • To ensure precise synchronization of all readout elements, from Front-End ASICs to event builders, with LHC bunch crossings.
  • To provide a generic, fully configurable firmware solution capable of handling diverse running conditions and test/calibration commands.
  • To enable real-time control and coordination of the entire readout chain in the upgraded LHCb system.

Proposed method

  • Implementation of a VHDL firmware core as the central controller for timing, trigger, and readout coordination.
  • Design of real-time logical processes to maintain synchronization with LHC bunch crossings (40 MHz).
  • Integration of asynchronous command generation for calibration and test procedures independent of the main timing stream.
  • Use of a generic, fully configurable architecture to adapt to varying operational and commissioning conditions.
  • Deployment and validation of the firmware in test-benches and test-beams for initial sub-detector commissioning.
  • Central distribution of clock and timing signals to all readout components to ensure global synchronization.

Experimental results

Research questions

  • RQ1How can a single firmware core achieve precise synchronization of all readout components across a 40 Tb/s data system?
  • RQ2What real-time control mechanisms are required to manage event building and timing distribution at 40 MHz?
  • RQ3How can the firmware support both normal operation and asynchronous calibration/test commands?
  • RQ4What architectural principles enable full configurability for diverse running conditions in the LHCb readout system?

Key findings

  • The Readout Supervisor firmware successfully synchronizes all readout elements with LHC bunch crossings at 40 MHz, enabling full-rate data acquisition.
  • The firmware supports both continuous synchronization and isolated asynchronous commands for calibration and diagnostics.
  • The system achieves full configurability through a generic firmware architecture that adapts to varying operational and commissioning scenarios.
  • The firmware has been validated in test-benches and test-beams, confirming its readiness for the LHCb detector upgrade.
  • The implementation enables centralized control of clock, timing, and trigger signals across the entire readout chain.

Read this paper

Open the full text in the Nubint reader and ask about any passage as you read.

Read this paper on Nubint

This review was generated by AI from the original paper. Please check the paper before citing it.