Skip to main content
QUICK REVIEW

[Paper Review] Unrelated machine scheduling of jobs with uniform smith ratios

Christos Kalaitzis, Ola Svensson|arXiv (Cornell University)|Jan 16, 2017
Scheduling and Optimization AlgorithmsEngineering4 citations
TL;DR

This paper presents a 1.21-approximation algorithm for scheduling jobs with uniform Smith ratios on unrelated machines to minimize weighted sum of completion times, using a modified Shmoys-Tardos rounding scheme on the Configuration-LP relaxation. The approach also yields a bi-criteria 2-approximation for makespan, with a tight analysis reducing worst-case cost to simple, analyzable instances.

ABSTRACT

We consider the classic problem of scheduling jobs on unrelated machines so as to minimize the weighted sum of completion times. Recently, for a small constant e > 0, Bansal et al. gave a (3/2 − e)-approximation algorithm improving upon the barrier of 3/2 which follows from independent randomized rounding. In simplified terms, their result is obtained by an enhancement of independent randomized rounding via strong negative correlation properties.In this work, we take a different approach and propose to use the same elegant rounding scheme for the weighted completion time objective as devised by Shmoys and Tardos for optimizing a linear function subject to makespan constraints. Our main result is a 1.21-approximation algorithm for the natural special case where the weight of a job is proportional to its processing time (specifically, all jobs have the same Smith ratio), which expresses the notion that each unit of work has the same weight. In addition, as a direct consequence of the rounding, our algorithm also achieves a bi-criteria 2-approximation for the makespan objective. Our technical contribution is a tight analysis of the expected cost of the solution compared to the one given by the Configuration-LP relaxation - we reduce this task to that of understanding certain worst-case instances which are simple to analyze.

Motivation & Objective

  • Address the scheduling problem of minimizing the weighted sum of completion times on unrelated machines, focusing on the special case where all jobs have the same Smith ratio.
  • Overcome the 3/2 approximation barrier for this objective by introducing a novel rounding technique tailored to uniform Smith ratios.
  • Achieve a bi-criteria approximation for the makespan objective as a byproduct of the rounding scheme.
  • Provide a tight analysis of the expected solution cost relative to the Configuration-LP relaxation, reducing worst-case instances to analyzable forms.

Proposed method

  • Adopt the Shmoys-Tardos rounding scheme for linear function minimization under makespan constraints, adapted to the weighted completion time objective.
  • Apply the rounding to the Configuration-LP relaxation, which models feasible job assignments across machines with capacity constraints.
  • Analyze the expected cost of the rounded solution by comparing it to the optimal Configuration-LP solution, focusing on worst-case instances.
  • Characterize worst-case scenarios as simple, structured instances that are analytically tractable, enabling tight bounds on approximation ratio.
  • Leverage the uniformity of Smith ratios (weight proportional to processing time) to simplify the analysis and improve approximation guarantees.
  • Establish a bi-criteria approximation for makespan by observing that the same rounding process yields a solution where makespan is at most twice the optimal.

Experimental results

Research questions

  • RQ1Can a tighter approximation ratio than 3/2 be achieved for unrelated machine scheduling with uniform Smith ratios?
  • RQ2How does the Shmoys-Tardos rounding scheme perform when applied to the Configuration-LP relaxation for the weighted completion time objective?
  • RQ3What is the worst-case behavior of the expected cost of the rounded solution relative to the Configuration-LP optimum?
  • RQ4Can the analysis of the rounding scheme be simplified by reducing worst-case instances to a tractable class of configurations?
  • RQ5What bi-criteria approximation guarantees does the rounding scheme provide for the makespan objective?

Key findings

  • The proposed algorithm achieves a 1.21-approximation for minimizing the weighted sum of completion times when all jobs have the same Smith ratio.
  • The rounding scheme yields a bi-criteria 2-approximation for the makespan objective, meaning the makespan of the solution is at most twice the optimal makespan.
  • The analysis of the expected cost is reduced to studying a small class of worst-case instances that are simple and analyzable.
  • The approximation ratio of 1.21 is achieved through a tight analysis of the Configuration-LP relaxation, exploiting the uniformity of Smith ratios.
  • The approach improves upon the 3/2 barrier for this special case by using a different rounding strategy than prior work based on strong negative correlation.
  • The method demonstrates that uniform Smith ratios enable stronger approximation guarantees than general unrelated machine scheduling.

Read this paper

Open the full text in the Nubint reader and ask about any passage as you read.

Read this paper on Nubint

This review was generated by AI from the original paper. Please check the paper before citing it.