Skip to main content
QUICK REVIEW

[Paper Review] Approximating Multiplicatively Weighted Voronoi Diagrams: Efficient Construction with Linear Size

Joachim Gudmundsson, Martin P. Seybold|arXiv (Cornell University)|Dec 23, 2021
Computational Geometry and Mesh GenerationComputer Science1 citations
TL;DR

This paper presents a novel algorithm for constructing ε-approximate multiplicatively weighted Voronoi diagrams (ε-AMWVDs) with optimal size and near-linear construction time. By introducing cores, adaptive refinement, and bisector coresets, the method achieves an output size of Od(n log(1/ε)/εd−1) and construction time within OD(log(n)/ε(d+5)/2) of this bound, proving the first optimal-size construction for MWVDs up to Θ(1)d-factors.

ABSTRACT

Given a set of $n$ sites from $\mathbb{R}^d$, each having some positive weight factor, the Multiplicatively Weighted Voronoi Diagram is a subdivision of space that associates each cell to the site whose weighted Euclidean distance is minimal for all points in the cell. We give novel approximation algorithms that output a cube-based subdivision such that the weighted distance of a point with respect to the associated site is at most $(1+\varepsilon)$ times the minimum weighted distance, for any fixed parameter $\varepsilon \in (0,1)$. The diagram size is $O_d(n \log(1/\varepsilon)/\varepsilon^{d-1})$ and the construction time is within an $O_D(\log(n)/\varepsilon^{(d+5)/2})$-factor of the size bound. We also prove a matching lower bound for the size, showing that the proposed method is the first to achieve \emph{optimal size}, up to $Θ(1)^d$-factors. In particular, the obscure $\log(1/\varepsilon)$ factor is unavoidable. As a by-product, we obtain a factor $d^{O(d)}$ improvement in size for the unweighted case and $O(d \log(n) + d^2 \log(1/\varepsilon))$ point-location time in the subdivision, improving the known query bound by one $d$-factor. The key ingredients of our approximation algorithms are the study of convex regions that we call cores, an adaptive refinement algorithm to obtain optimal size, and a novel notion of \emph{bisector coresets}, which may be of independent interest. In particular, we show that coresets with $O_d(1/\varepsilon^{(d+3)/2})$ worst-case size can be computed in near-linear time.

Motivation & Objective

  • To address the lack of efficient, optimal-size constructions for multiplicatively weighted Voronoi diagrams (MWVDs), which can have quadratic size in 2D and are challenging due to non-convex regions and violation of triangle inequality.
  • To design a cube-based ε-approximate MWVD (ε-AMWVD) that guarantees (1+ε)-approximate nearest-site queries for all points in each cell.
  • To achieve optimal output size, proven via a matching lower bound, and near-optimal construction time, improving over prior general frameworks like Har-Peled and Kumar (2004).
  • To reduce the point-location query time in high dimensions from O(d log n) to O(d log n + d² log(1/ε)), and improve unweighted Voronoi size by a factor of dO(d).
  • To introduce and leverage novel geometric primitives—cores, bisector coresets, and adaptive refinement—enabling efficient and provably optimal approximation.

Proposed method

  • The method introduces 'cores' as convex regions defined by the intersection of at most n−1 Apollonian bisectors, which capture the essential structure of Voronoi cells.
  • An adaptive refinement algorithm recursively subdivides cores into d-dimensional cubes, ensuring ε-approximation while minimizing output size.
  • Bisector coresets are constructed by selecting O(1/ε(d+3)/2) sites per cone, using geometric properties such as angular and radial translation bounds to control approximation error.
  • The algorithm uses affine transformations and cone-based site selection to bound the (1+ε) approximation factor across all four cases of site pairings (LL, LH, HL, HH) based on diameter and weight.
  • It applies a novel coreset construction with O(1/ε²C) sites per cone to maintain (1+εC) approximation, and uses weight monotonicity to eliminate redundant site checks.
  • The final ε-AMWVD is built by combining these coresets and using a compressed QuadTree-based search structure for efficient point location.

Experimental results

Research questions

  • RQ1Can we construct an ε-approximate MWVD with optimal output size, specifically Od(n log(1/ε)/εd−1), for any ε ∈ (0,1)?
  • RQ2Is it possible to achieve construction time within OD(log(n)/ε(d+5)/2) of the output size, matching the theoretical lower bound up to Θ(1)d-factors?
  • RQ3Can the use of cores and coresets reduce the size of unweighted Voronoi diagrams by a factor of dO(d), as a byproduct of the method?
  • RQ4How can we maintain a (1+ε)-approximation in high dimensions (d = O(log n / ε²)) while ensuring efficient point-location query time?
  • RQ5Can the novel notion of bisector coresets be used to achieve near-linear time coreset computation with provable (1+ε) approximation guarantees?

Key findings

  • The proposed algorithm constructs an ε-AMWVD with output size Od(n log(1/ε)/εd−1), which matches the proved lower bound up to Θ(1)d-factors, establishing optimality in size.
  • Construction time is OD(log(n)/ε(d+5)/2) times the output size, making it the first method to achieve this near-optimal construction time for MWVDs.
  • The method improves the point-location query time in high dimensions to O(d log n + d² log(1/ε)), a factor of d better than previous bounds.
  • A byproduct of the approach is a dO(d)-factor improvement in size for unweighted Voronoi diagrams, and a reduction in query time by one d-factor.
  • The algorithm computes bisector coresets of size Od(1/ε(d+3)/2) in OD(n log n / ε3(d+1)/2) time, which is near-linear relative to the output size.
  • The paper proves that the log(1/ε) factor in the size bound is unavoidable, resolving a key open question in approximation of MWVDs.

Read this paper

Open the full text in the Nubint reader and ask about any passage as you read.

Read this paper on Nubint

This review was generated by AI from the original paper. Please check the paper before citing it.