Skip to main content
QUICK REVIEW

[Paper Review] Fast Resource Scheduling for Distribution Systems Enabled with Discrete Control Devices

Alireza Nouri, Alireza Soroudi|arXiv (Cornell University)|Jan 9, 2020
Smart Grid Energy ManagementEngineering18 references6 citations
TL;DR

This paper proposes a fast, globally convergent branch-and-cut framework for short-term distribution system scheduling using both continuous (e.g., inverters) and discrete control devices (e.g., OLTCs, SVRs). It accelerates convergence by solving a simplified LP problem before applying a trust region algorithm (TRA) at each node, reducing computation time significantly while ensuring optimality.

ABSTRACT

This paper proposes a framework for fast short-term scheduling and steady-state voltage control in distribution systems enabled with both continuous control devices, e.g., inverter interfaced DGs and discrete control devices (dcds), e.g., on-load tap changers (oltcs). The voltage-dependent nature of loads is taken into account to further reduce the operating cost by managing the voltage levels. The branch and cut method is applied to handle the integrality constraints associated with the operation of dcds. A globally convergent trust-region algorithm (tra) is applied to solve the integer relaxed problems at each node during the branching process. The tra sub-problems are solved using the interior point method. To reduce the branching burden of the branch and cut algorithm, before applying tra at each node, a simplified optimization problem is first solved. Using the convergence status and value of the objective function of this problem, a faster decision is made on stopping the regarding branch. Solving the simplified problem obviates the application of tra at most nodes. It is shown that the method converges to the optimal solution with a considerable saving in computation time according to the numerical studies.

Motivation & Objective

  • Address the challenge of near-real-time optimal resource scheduling in active distribution systems with high DER penetration.
  • Enable efficient voltage control by modeling voltage-dependent load characteristics and accurate OLTC behavior.
  • Develop a fast, globally convergent solution method for mixed-integer nonlinear programming (MINLP) problems arising in distribution scheduling.
  • Reduce computational burden in branch-and-cut by pre-screening nodes using a simplified LP problem to avoid expensive TRA solves.
  • Ensure solution optimality and feasibility while meeting time-critical operational requirements.

Proposed method

  • Formulate the distribution scheduling problem (DSP) as a mixed-integer nonlinear program (MINLP) incorporating both continuous and discrete control devices.
  • Apply a branch-and-cut (BC) algorithm to handle integer variables associated with discrete control devices (DCDs), such as OLTCs and capacitor banks.
  • Use a globally convergent trust region algorithm (TRA) as the sub-algorithm to solve the continuous relaxation of the MINLP at each node.
  • Solve TRA sub-problems using the interior point method, with power flow calculations used to update voltage values and refine the model function iteratively.
  • Introduce a pre-solve LP problem before TRA application at each node to quickly assess whether the branch can be fathomed (pruned), avoiding unnecessary TRA computations.
  • Leverage the solution status and objective value of the LP problem to make fast decisions on pruning branches, significantly reducing the branching effort.

Experimental results

Research questions

  • RQ1Can a globally convergent and computationally efficient method be developed for short-term scheduling in active distribution systems with mixed-integer nonlinear constraints?
  • RQ2How can the computational burden of branch-and-cut be reduced without sacrificing solution optimality in MINLP-based distribution scheduling?
  • RQ3To what extent does modeling voltage-dependent load characteristics improve operational cost reduction in distribution systems?
  • RQ4Can a simplified LP problem effectively predict the outcome of expensive TRA sub-problems to enable early pruning of non-promising branches?
  • RQ5How does the proposed method compare to SOCP-based approaches in terms of solution quality and computational speed under unbalanced, practical system conditions?

Key findings

  • The proposed method achieves global convergence to the optimal solution of the MINLP-based distribution scheduling problem.
  • By using a pre-solved LP problem to guide branching decisions, the method avoids applying the trust region algorithm (TRA) at the majority of nodes, leading to substantial computation time savings.
  • The solution time remains acceptable and competitive with SOCP-based methods, especially considering the superior solution quality.
  • The method outperforms SOCP in terms of optimality, particularly under unbalanced loading conditions, due to its ability to model independent-per-phase voltage control and nonlinear load models.
  • The use of accurate OLTC models and voltage-dependent load characteristics enables significant operating cost reduction by allowing lower voltage levels on heavily loaded phases.
  • Numerical studies on the IEEE 33-bus system show that the proposed method maintains high solution quality while being fast enough for near-real-time applications.

Read this paper

Open the full text in the Nubint reader and ask about any passage as you read.

Read this paper on Nubint

This review was generated by AI from the original paper. Please check the paper before citing it.