Mehrnaz Anvari, Marius Neuwirth|arXiv (Cornell University)|Jan 21, 2026
Integrated Energy Systems OptimizationEngineering0 citations
TL;DR

The paper couples energy-system scenarios with a dense-phase CO2 pipeline simulator (MYNTS) to design a Germany-wide CO2 network, assess technical feasibility, and estimate investment costs.

ABSTRACT

Carbon capture and storage or utilization (CCUS) will play an important role to achieve climate neutrality in many economies. Pipelines are widely regarded as the most efficient means of CO2 transport; however, they are currently non-existent. Policy-makers and companies need to develop large-scale infrastructure under substantial uncertainty. Methods and analyses are needed to support pipeline planning and strategy development. This paper presents an integrated method for designing CO2 pipeline networks by combining energy system scenarios with physical network simulation. Using Germany as a case study, we derive spatially highly resolved CO2 balances to develop a dense-phase CO2 pipeline topology that follows existing gas pipeline corridors. The analyzed system includes existing sites for cement and lime production, waste incineration, carbon users, four coastal CO2 hubs, and border crossing points. We then apply the multiphysical network simulator MYNTS to assess the technical feasibility of this network. We determine pipeline diameters, pump locations, and operating conditions that ensure stable dense-phase transport. The method explicitly accounts for elevation and possible impurities. The results indicate that a system of about 7000 km pipeline length and a mixed normed diameter of DN700 on main corridors and of DN500/DN400 on branches presents a feasible solution to connect most sites. Investment costs for the optimized pipeline system are calculated to be about 17 billion Euros. The method provides a reproducible framework and is transferable to other countries and to European scope.

Motivation & Objective

  • Derive spatially resolved CO2 balances from energy-system scenarios for climate-neutral Germany.
  • Develop a CO2 pipeline topology connecting sources, hubs, and sinks along gas corridors.
  • Simulate dense-phase CO2 transport to assess feasibility and identify key design parameters (diameters, pumps, temperatures, pressures).
  • Estimate investment costs and provide a transferable framework for other regions.

Proposed method

  • Combine energy-system scenario data with physical pipeline simulation using MYNTS (Multiphysical Network Simulator).
  • Develop a two-step heuristic to build CO2 topology by following natural gas transmission corridors and connecting sites to nearest corridors.
  • Use GERG-2008 equation of state and Hofer friction model to simulate dense-phase CO2 transport and phase behavior with impurities.
  • Model pumps as setpoint pressure boosters within a semi-coupled non-isothermal Euler framework.
  • Incorporate elevation effects and heat transfer to compute feasible pressure/temperature profiles along the network.
  • Provide a framework that can be transferred to other countries or European-scale studies.

Experimental results

Research questions

  • RQ1What technical parameters (diameter, number of pumps, operating pressures/temperatures) are required to enable dense-phase CO2 transport over a Germany-scale network?
  • RQ2What network design combinations (diameter layout, topological routing) yield cost-effective investment while ensuring feasibility of dense-phase transport?
  • RQ3How do impurities, elevation, and cross-border flows affect CO2 pipeline feasibility and sizing?
  • RQ4Can scenario-driven topology be validated with a physical flow simulator to produce actionable investment estimates?

Key findings

  • The study proposes a dense-phase CO2 network of about 7,000 km in Germany, optimized with mixed pipeline diameters (DN700 on main corridors and DN500/DN400 on branches).
  • An optimized topology reduces pumping needs while maintaining hydraulic feasibility, with a notable configuration using DN700 where mass flow is high and DN500/DN400 on lower-flow branches.
  • Pipelines and pump infrastructure costs are estimated under specific diameter configurations, with total pipeline costs around 17–24 billion euros depending on the diameter layout (e.g., 17.3 bil € for certain configurations) and pump costs ranging from ~67.5 to 150 million euros across configurations.
  • The results show that DN700 main corridors plus smaller branch diameters can achieve a cost-competitive design relative to a uniform DN500 network, while meeting pressure and velocity constraints.
  • The methodology uses a reproducible, transferable framework (MYNTS) that couples scenario-derived CO2 balances with detailed physical flow simulations, accommodating elevation, impurities, and cross-border considerations.
  • The study provides concrete parameters (e.g., target pressures between 85 and 180 barg, cH values, and specific EoS/friction models) to enable dense-phase transport design.

Read this paper

Open the full text in the Nubint reader and ask about any passage as you read.

Read this paper on Nubint

This review was generated by AI from the original paper. Please check the paper before citing it.