[Paper Review] High Resolution Generation Expansion Planning Considering Flexibility Needs: The Case of Switzerland in 2030
This paper proposes a high-resolution, nodal dispatch-based generation expansion planning (GEP) model co-optimizing investment and operational decisions for Switzerland in 2030, explicitly accounting for flexibility needs from renewables, storage, and cross-border imports. The model reveals that meeting a 9 TWh non-hydro RES target by 2030 increases tertiary reserve requirements by 26 MW (up) and 28 MW (down), yet no new dispatchable units are needed due to low-cost biomass and market-based imports.
This paper presents a static generation expansion planning formulation in which operational and investment decisions for a wide range of technologies are co-optimized from a centralized perspective. The location, type and quantity of new generation and storage capacities are provided such that system demand and flexibility requirements are satisfied. Depending on investments in new intermittent renewables (wind, PV), the flexibility requirements are adapted in order to fully capture RES integration costs and ensure normal system operating conditions. To position candidate units, we incorporate DC constraints, nodal demand and production of existing generators as well as imports and exports from other interconnected zones. To show the capabilities of the formulation, high-temporal resolution simulations are conducted on a 162-bus system consisting of the full Swiss transmission grid and aggregated neighboring countries.
Motivation & Objective
- To develop a centralized, co-optimized generation expansion planning (GEP) model that integrates investment and operational decisions under high renewable penetration.
- To explicitly model system flexibility needs arising from intermittent renewables (PV, wind) through dynamic reserve requirements and nodal dispatch.
- To position new generation and storage units at optimal locations using DC power flow constraints and nodal demand data.
- To evaluate the impact of a 9 TWh non-hydro RES target on investment, reserves, and electricity prices in Switzerland by 2030.
- To validate the model’s operational accuracy using high-temporal-resolution simulations (every other day, hourly) against historical data.
Proposed method
- Formulates a static, mixed-integer linear program (MILP) minimizing total system cost, including investment, production, start-up, and load-shedding costs.
- Incorporates nodal dispatch with DC power flow constraints to model network congestion and real-time power injections.
- Models flexibility through tertiary reserve requirements that scale with intermittent RES capacity, ensuring system security.
- Uses market-based cross-border tie-line limits instead of full line capacity to reflect realistic import/export potential.
- Simulates 162-bus Swiss transmission system with aggregated neighboring countries at high temporal (hourly, every other day) and spatial resolution.
- Integrates detailed cost parameters for candidate units (gas, biomass, wind, PV) and assumes no subsidies for wind/PV, with biomass reflecting ongoing waste incineration subsidies.
Experimental results
Research questions
- RQ1How does the inclusion of dynamic tertiary reserve requirements affect investment decisions under high renewable penetration in Switzerland by 2030?
- RQ2What is the optimal mix and location of new generation and storage capacity when flexibility needs from intermittent RES are explicitly modeled?
- RQ3To what extent can cross-border imports substitute for new domestic dispatchable capacity under a 9 TWh non-hydro RES target?
- RQ4How do increased RES shares impact system reserve requirements and electricity prices in a price-taker market like Switzerland’s?
- RQ5How well does the high-temporal-resolution operational model align with historical data, and what impact does this have on investment outcomes?
Key findings
- Under the business-as-usual scenario, all 12 biomass candidate units (240 MW) are built due to low costs and declining nuclear output, even without a RES target.
- To meet the 9 TWh non-hydro RES target, 3,254 MW of PV and 240 MW of biomass are built, with the remaining 3.36 TWh supplied by existing generators.
- The tertiary reserve requirements increase by 26 MW (up) and 28 MW (down) in the RES target scenario due to higher intermittent RES integration.
- Despite the increased reserve needs, no new dispatchable thermal units are built, as low-cost biomass and market-based imports satisfy flexibility needs.
- Electricity prices rise by 47% in the RES target scenario and 51% in the business-as-usual scenario compared to 2015, driven by reduced domestic generation and higher fuel/CO2 costs.
- In 2030, Switzerland becomes a net electricity importer in winter and June—months previously export-oriented—due to nuclear phase-out and low solar output, with France becoming the primary import source.
Read this paper
Open the full text in the Nubint reader and ask about any passage as you read.
Read this paper on NubintThis review was generated by AI from the original paper. Please check the paper before citing it.