[Paper Review] Repair and Resource Scheduling in Unbalanced Distribution Systems using Neighborhood Search

Anmar Arif, Zhaoyu Wang|arXiv (Cornell University)|Aug 30, 2018
Optimal Power Flow DistributionEngineering20 references5 citations
TL;DR

This paper proposes a mixed-integer linear programming (MILP) model and a neighborhood search-based algorithm to co-optimize crew scheduling, resource logistics, network reconfiguration, and distributed energy resource dispatch in unbalanced distribution systems after large outages. The method improves restoration speed and load supply by dynamically coordinating line and tree crews, integrating photovoltaic and battery systems, and achieving 100% load restoration in 8 hours on the IEEE 123-bus system and a 10.2% cost reduction on the 8500-bus system compared to baseline methods.

ABSTRACT

This paper proposes an optimization strategy to assist utility operators to recover power distribution systems after large outages. Specifically, a mixed-integer linear programming (MILP) model is developed for co-optimizing crews, resources, and network operations. The MILP model coordinates damage isolation, network reconfiguration, distributed generator re-dispatch, and crew/resource logistics. In addition, a framework for integrating different types of photovoltaic (PV) systems in the restoration process is developed.} We consider two different types of crews, namely, line crews for damage repair and tree crews for obstacle removal. We also model the repair resource logistic constraints. Furthermore, a new algorithm is developed for solving the distribution system repair and restoration problem (DSRRP). The algorithm starts by solving DSRRP using an assignment-based method, then a neighborhood search method is designed to iteratively improve the solution. The proposed method is validated on modified IEEE 123- and 8500-bus distribution test systems.

Motivation & Objective

  • Address the challenge of restoring unbalanced, three-phase distribution systems after large-scale outages caused by severe weather.
  • Coordinately optimize repair crews, resource logistics, network reconfiguration, and distributed energy resources (DERs) including PVs and BESS.
  • Develop a scalable solution framework that integrates different crew types (line and tree crews) and accounts for repair time updates and dynamic routing.
  • Improve restoration efficiency by minimizing load interruption costs and total operational cost through advanced scheduling and reoptimization.
  • Enable real-time adaptability by allowing the algorithm to restart and update routes when repair time estimates change.

Proposed method

  • Formulate a mixed-integer linear programming (MILP) model to co-optimize damage repair, network reconfiguration, crew routing, and DER dispatch in unbalanced three-phase distribution systems.
  • Model two distinct crew types: line crews for component repair and tree crews for obstacle clearance, each with assigned repair times and travel constraints.
  • Incorporate repair resource logistics by tracking resource availability at depots and crew-specific resource acquisition using binary and continuous variables.
  • Introduce a three-stage algorithm: first solve via an assignment-based method, then apply a neighborhood search to iteratively improve the routing and scheduling solution.
  • Design a dynamic reoptimization mechanism that updates crew routes based on incumbent solutions when repair times are revised, enabling adaptive restoration planning.
  • Integrate photovoltaic (PV) systems and battery energy storage systems (BESS) into the restoration process using a novel framework that models their connectivity and power output based on solar irradiance and state-of-charge constraints.

Experimental results

Research questions

  • RQ1How can repair crews and resources be optimally scheduled to minimize load interruption and operational costs in unbalanced distribution systems after large outages?
  • RQ2What is the impact of integrating photovoltaic systems and battery energy storage on the restoration speed and cost in distribution system restoration?
  • RQ3How does the proposed neighborhood search algorithm improve upon baseline methods in terms of solution quality and computational efficiency for large-scale distribution systems?
  • RQ4Can the algorithm dynamically adapt to updated repair time estimates during the restoration process while maintaining solution quality?
  • RQ5What is the scalability of the proposed method on large distribution feeders such as the IEEE 8500-bus system under time constraints?

Key findings

  • The proposed algorithm restored 100% of the load in 8 hours on the IEEE 123-bus system, with switches operated in sequence to restore power in phases after key lines were repaired.
  • On the IEEE 8500-bus system, the Reoptimization algorithm reduced the total cost by 10.2% ($849,842 vs. $763,184) compared to the priority-based method, despite a longer computation time of 40 minutes versus 32 minutes.
  • The algorithm successfully handled 35 damaged lines (15 tree-induced) across 3 depots with 12 line crews and 8 tree crews, demonstrating scalability to large distribution systems.
  • The Reoptimization algorithm achieved a 10.2% cost reduction and better load supply performance over time, as shown in Figure 14, even though the optimality gap could not be determined due to CPLEX convergence issues.
  • The dynamic reoptimization capability allowed the algorithm to restart and update crew routes when repair times changed, ensuring adaptability during real-time restoration.
  • The integration of PV and BESS systems was effectively modeled, with active power output and state-of-charge tracked over time, enabling coordinated support during restoration.

Read this paper

Open the full text in the Nubint reader and ask about any passage as you read.

Read this paper on Nubint

This review was generated by AI from the original paper. Please check the paper before citing it.