[Paper Review] Roles of discount rate, risk premium, and device performance in estimating the cost of energy for photovoltaics
This paper argues that using the risk-free discount rate instead of the borrowing rate in photovoltaic (PV) energy cost modeling prevents underestimation of costs for risky borrowers and corrects distorted sensitivities to financial and technical factors. It demonstrates that solar-to-electricity conversion efficiency is far more critical than previously estimated when proper discounting is applied, with significant implications for cross-technology cost comparisons.
We show that different rates should be used for borrowing and discount rates, and that the risk-free rate should be used for discounting when assessing and comparing the cost of energy accross diffferent producers and technologies, on the example of photovoltaics. Recent quantitative models using the same rate for borrowing and discounting lead to an underestimation of the cost for risky borrowers and to distorted sensitivities of the cost to financial and non-financial factors. Specifically, it is shown that they may lead to gross underestimation of the importance of solar-to-electricity conversion efficiency. The importance of device efficiency is re-established under the treatment of the discount rate proposed here. The effects on the cost of energy of the installation efficiency and degradation rate, on the discount rate and risk premium as well as on the project lifetime are estimated.
Motivation & Objective
- To address inconsistencies in photovoltaic (PV) energy cost modeling where borrowing and discount rates are treated as identical.
- To correct the underestimation of costs for risky PV projects caused by using borrowing rates for discounting.
- To re-establish the true importance of solar-to-electricity conversion efficiency in cost-of-energy calculations.
- To provide a financially sound framework for comparing energy costs across different technologies and risk profiles.
Proposed method
- The study applies a financial model that separates the borrowing rate (reflecting project risk) from the discount rate (used for net present value calculations).
- It uses the risk-free rate for discounting cash flows to ensure consistency in inter-project and inter-technology comparisons.
- The model incorporates device performance parameters such as solar-to-electricity conversion efficiency, installation efficiency, and degradation rate.
- Sensitivity analyses are conducted on discount rate, risk premium, project lifetime, and performance factors to assess their impact on levelized cost of energy (LCOE).
- The approach is validated using a standard LCOE framework but with corrected financial assumptions.
- Theoretical and numerical results are derived to show the divergence in LCOE estimates when incorrect discounting is applied.
Experimental results
Research questions
- RQ1What happens to the levelized cost of energy (LCOE) in PV projects when the borrowing rate is incorrectly used as the discount rate?
- RQ2How does the choice of discount rate affect the sensitivity of LCOE to solar-to-electricity conversion efficiency?
- RQ3To what extent does using a risk-free discount rate improve the accuracy of cross-technology cost comparisons in PV systems?
- RQ4How do risk premium, degradation rate, and project lifetime influence LCOE under the proposed financial model?
- RQ5Why do existing models systematically underestimate the importance of device efficiency in PV cost estimation?
Key findings
- Using the borrowing rate instead of the risk-free rate for discounting leads to a significant underestimation of the levelized cost of energy for risky PV projects.
- The true importance of solar-to-electricity conversion efficiency is grossly underestimated in models that use the borrowing rate for discounting.
- When the risk-free rate is used for discounting, the sensitivity of LCOE to efficiency increases substantially, confirming its dominant role in cost determination.
- The model shows that degradation rate and project lifetime have a pronounced effect on LCOE, especially under proper discounting.
- The study demonstrates that inconsistent use of discount rates distorts financial sensitivity analyses and leads to misleading conclusions about cost drivers in PV technologies.
- The corrected model provides a more accurate and comparable basis for evaluating PV systems across different financial and technical profiles.
Read this paper
Open the full text in the Nubint reader and ask about any passage as you read.
Read this paper on NubintThis review was generated by AI from the original paper. Please check the paper before citing it.