[Paper Review] Status of the HIE-ISOLDE project at CERN
The HIE-ISOLDE project upgrades CERN's ISOLDE facility by installing a 40 MV superconducting linac with 32 niobium-coated quarter-wave resonators in six cryomodules, increasing post-accelerated radioactive beam energy from 3 MeV/u to over 10 MeV/u in a staged rollout. This enables new nuclear physics experiments, including transfer reactions and precision studies across the nuclear chart, with improved beam intensity, emittance, and energy variability via staged cryomodule installation and pre-bunching systems.
The HIE-ISOLDE project represents a major upgrade of the ISOLDE nuclear facility with a mandate to significantly improve the quality and increase the intensity and energy of radioactive nuclear beams produced at CERN. The project will expand the experimental nuclear physics programme at ISOLDE by focusing on an upgrade of the existing Radioactive ion beam EXperiment (REX) linac with a 40 MV superconducting linac comprising thirty-two niobium-on-copper sputter-coated quarter-wave resonators housed in six cryomodules. The new linac will raise the energy of post-accelerated beams from 3 MeV/u to over 10 MeV/u. The upgrade will be staged to first deliver beam energies of 5.5 MeV/u using two high-$β$ cryomodules placed downstream of REX, before the energy variable section of the existing linac is replaced with two low-$β$ cryomodules and two additional high-$β$ cryomodules are installed to attain over 10 MeV/u with full energy variability above 0.45 MeV/u. An overview of the project including a status summary of the different R&D activities and the schedule will outlined.
Motivation & Objective
- To significantly enhance the energy and intensity of post-accelerated radioactive ion beams at CERN's ISOLDE facility.
- To enable new experimental capabilities in nuclear structure and reaction studies by extending beam energy up to 10 MeV/u.
- To improve beam quality through reduced emittance via the ISCOOL cooler and improved ion source and target systems.
- To provide full energy variability above 0.45 MeV/u and support for highly charged ions using upgraded charge breeder technology.
- To ensure minimal disruption to ongoing experiments by scheduling major upgrades during CERN's Long Shutdown periods.
Proposed method
- Install a 40 MV superconducting linac composed of 32 niobium-on-copper sputter-coated quarter-wave resonators (QWRs) operating at 101.28 MHz.
- Deploy the upgrade in stages: first two high-β cryomodules (βg = 10.3%) downstream of REX to reach 5.5 MeV/u, followed by replacement of the energy-variable section with low-β (βg = 6.3%) cryomodules.
- Integrate two additional high-β cryomodules and two low-β cryomodules in a modular fashion to achieve full energy range up to 10 MeV/u.
- Implement a pre-bunching scheme before the RFQ using sub-harmonic frequencies and a beam chopper to enable time-of-flight detection and reduce background from satellite bunches.
- Utilize SC solenoids, steering magnets, and beam diagnostics systems to maintain beam stability and optical performance within tight space constraints.
- Design the High-Energy Beam Transfer (HEBT) line with advanced magnet technology to support isobaric separation and three experimental stations.
Experimental results
Research questions
- RQ1What is the maximum achievable beam energy for post-accelerated radioactive ions after the HIE-ISOLDE upgrade?
- RQ2How can beam emittance and intensity be improved to support advanced nuclear physics experiments?
- RQ3What are the optimal configurations and staging strategies for the superconducting linac to ensure early beam availability and full energy reach?
- RQ4How can beam time structure be tailored independently of the proton beam and target diffusion properties?
- RQ5What safety measures are required to mitigate risks from X-rays, neutrons, cryogenic systems, and radioactive contamination?
Key findings
- The HIE-ISOLDE linac is designed to deliver a total accelerating voltage of 39.6 MV with a minimum synchronous phase of -20°, enabling beam energies above 10 MeV/u for the heaviest ions (A/q = 4.5).
- The first stage of the upgrade, with two high-β cryomodules, will deliver beam energy up to 5.5 MeV/u, with commissioning planned for late 2014.
- The full upgrade, including four additional cryomodules (two high-β and two low-β), will extend the energy range to over 10 MeV/u with full energy variability above 0.45 MeV/u.
- The pre-bunching and chopping system, planned for after 2017, will allow for ~100 ns bunch spacing and enable time-of-flight detection at experiments.
- The beam emittance is expected to be significantly improved through the installation of ISCOOL, a radiofrequency quadrupole cooler and buncher, placed after the pre-separator.
- The project is on schedule for beam commissioning at 5.5 MeV/u by end-2014, with first physics experiments expected in early 2015.