TL;DR

This paper proposes a bilevel optimization model for transmission expansion planning (TEP) that jointly determines optimal transmission line and phase-shifting transformer (PST) investments under wind power uncertainty. By reformulating the market-clearing lower-level problem via its primal-dual conditions, the bilevel model is transformed into a single-level mixed-integer linear program (MILP), enabling efficient solution. Results on the IEEE 24-bus system show that PST integration reduces total planning cost by $60M and increases wind penetration by 2.3 percentage points compared to TEP alone, while flattening locational marginal prices (LMPs) and improving congestion management.

ABSTRACT

In this paper, the phase shifting transformer (PST) is introduced in the Transmission Expansion Planning (TEP) problem considering significant wind power integration. The proposed planning model is formulated as a bilevel program which seeks to determine the optimal strategy for the network reinforcements and the PST locations. The objective of the upper level problem is to minimize the total consumer payment, the investment cost on transmission line and PST. The lower level problems designate the electricity market clearing conditions under different load-wind scenarios. The bilevel model is transformed into a single level mixed integer linear program (MILP) by replacing each lower level problem with its primal-dual formulation. The numerical case studies based on IEEE 24-bus system demonstrate the characteristics of the proposed model. Moreover, the simulation results show that the installation of PST adds flexibility to the TEP and facilitates the integration of wind power.

Motivation & Objective

  • To address the challenge of integrating high levels of wind power into transmission networks while minimizing system costs.
  • To develop a planning framework that jointly optimizes transmission line and phase-shifting transformer (PST) investments under market-clearing conditions.
  • To model the strategic interaction between system planners (upper-level) and market operators (lower-level) under load and wind uncertainty.
  • To evaluate the economic and operational benefits of PSTs in reducing congestion and curtailment in transmission expansion planning.

Proposed method

  • Formulates the TEP problem as a bilevel optimization: the upper level minimizes total cost (investment + consumer payments), and the lower level clears electricity markets under multiple load-wind scenarios.
  • Replaces each lower-level market-clearing problem with its Karush-Kuhn-Tucker (KKT) conditions, then transforms them into primal-dual formulations to convert the bilevel problem into a single-level mixed-integer linear program (MILP).
  • Uses a scenario-based approach to represent wind and load uncertainties, with each scenario corresponding to a distinct load and wind power output combination.
  • Incorporates binary variables for line investment ($\alpha_k$) and PST installation ($\delta_k$), with constraints on PST phase shift limits ($\theta_k^{p,min}$ to $\theta_k^{p,max}$) and investment budgets.
  • Applies annualized investment costs ($\tilde{A}_k^l$, $\tilde{A}_k^p$) to account for long-term capital recovery in the objective function.
  • Solves the resulting single-level MILP using commercial solvers, enabling efficient computation of optimal expansion plans.

Experimental results

Research questions

  • RQ1How does the inclusion of phase-shifting transformers (PSTs) affect the total planning cost and wind power integration in transmission expansion planning?
  • RQ2To what extent can PSTs reduce transmission congestion and improve locational marginal price (LMP) profiles compared to conventional TEP?
  • RQ3What is the optimal trade-off between PST investment budget and cost savings in the presence of wind power uncertainty?
  • RQ4How does the joint planning of transmission lines and PSTs compare economically and operationally to TEP alone under varying investment constraints?

Key findings

  • The total consumer payment decreased from $430.31M (Case 1, no reinforcement) to $309.61M (Case 4, $30M PST budget), representing a $120.7M reduction compared to Case 1 and a $60M savings compared to Case 2 (TEP only).
  • With a $30M PST budget (Case 4), the model avoided building the most expensive line (9-12), reducing line investment cost to $14.12M and avoiding $20.83M in line construction from Case 2.
  • Wind penetration increased from 28.84% (Case 1) to 31.46% (Case 4), a 2.62 percentage point improvement, with 2 PSTs installed on lines 3-9 and 8-10.
  • The installation of PSTs led to flatter LMP profiles across buses, especially in high-load and high-wind scenarios, indicating reduced congestion and improved market efficiency.
  • The majority of cost savings were achieved with a $30M or $45M PST budget, suggesting diminishing returns beyond two to three PSTs.
  • Computational time remained low (under 1 second for all cases), demonstrating the efficiency of the proposed single-level MILP reformulation.

Read this paper

Open the full text in the Nubint reader and ask about any passage as you read.

Read this paper on Nubint

This review was generated by AI from the original paper. Please check the paper before citing it.