[Paper Review] Coordinated Multi-area Economic Dispatch via Critical Region Projection
This paper proposes a coordinated multi-area economic dispatch (MAED) method using critical region projection (CRP), which decomposes the joint economic dispatch problem by treating boundary phase angles as coupling variables. By leveraging multi-parametric quadratic programming, CRP characterizes optimal generation and cost as piecewise affine and quadratic functions over critical regions, enabling finite-step convergence through iterative coordination between local operators and a coordinator with minimal information exchange.
A coordinated economic dispatch method for multi-area power systems is proposed. Choosing boundary phase angles as coupling variables, the proposed method exploits the structure of critical regions in local problems defined by active and inactive constraints. For a fixed boundary state given by the coordinator, local operators compute the coefficients of critical regions containing the boundary state and of the optimal cost functions then communicate them to the coordinator who in turn optimizes the boundary state to minimize the overall cost. By iterating between local operators and the coordinator, the proposed algorithm converges to the global optimal solution in finite steps, and it requires limited information sharing.
Motivation & Objective
- Address the challenge of decentralized joint economic dispatch in interconnected power systems where independent system operators (ISOs) must coordinate without disclosing private system information.
- Overcome the high iteration count and communication cost of traditional Lagrangian relaxation methods in multi-area economic dispatch (MAED).
- Achieve finite-step convergence—unlike iterative methods such as Lagrangian relaxation—by exploiting the structure of critical regions in parametric optimization.
- Minimize information sharing between ISOs by exchanging only boundary state, critical region parameters, and cost functions, avoiding disclosure of internal system parameters.
- Develop a practical, scalable framework for coordinated MAED that maintains accuracy and efficiency across diverse test systems, including large-scale networks.
Proposed method
- Formulate the joint economic dispatch (JED) problem as a decentralized optimization with boundary phase angles as coupling variables between interconnected areas.
- For each area, solve a local economic dispatch sub-problem and derive the critical region containing the current boundary state, along with the associated piecewise affine generation and piecewise quadratic cost functions.
- Use multi-parametric quadratic programming (mp-QP) to characterize the optimal solution as a function of the boundary state, partitioning the state space into critical regions.
- The coordinator aggregates local cost functions and solves a master problem to minimize the total system cost, projecting the boundary state to a new critical region with lower cost.
- Iterate between local operators and the coordinator: each area computes its critical region and cost function for the current boundary state, and the coordinator updates the boundary state to a lower-cost region.
- Apply redundancy removal in inequality descriptions of critical regions to reduce communication overhead, especially in large systems.
Experimental results
Research questions
- RQ1Can a decentralized MAED method achieve finite-step convergence without requiring full disclosure of internal system data?
- RQ2How can the structure of critical regions in multi-parametric programming be exploited to reduce communication and computation in multi-area economic dispatch?
- RQ3What is the trade-off between convergence speed, communication cost, and information privacy in coordinated economic dispatch?
- RQ4How does the proposed CRP method compare in performance and accuracy to established methods like Lagrangian relaxation and marginal equivalent decomposition (MED) in large-scale systems?
- RQ5To what extent does the dimensionality of the boundary state space affect the scalability and communication efficiency of the algorithm?
Key findings
- CRP achieved the same optimal cost as the centralized JED in all test cases, including the IEEE 30-bus, 118-bus, 300-bus, and 448-bus systems, confirming its optimality.
- In the IEEE 30-bus system, CRP converged in 2 iterations with a total cost of $14,597.54/hr, matching JED, while using only 188 float data exchanges—significantly less than MED (876) and LR (1016).
- In scenario 2, where MED became infeasible due to constraint violations, CRP still converged in 2 iterations with optimal cost ($6,095.31/hr), demonstrating robustness.
- In the 3-area 448-bus system, CRP matched JED’s cost of $8.31×10⁵/hr and required only 5 iterations, outperforming MED (higher cost) and LR (failed to converge).
- CRP reduced communication costs by 55% compared to MED in the 448-bus system, exchanging only 1,618 float data points versus MED’s 3,630, despite similar iteration counts.
- Redundancy removal in critical region inequalities reduced the number of constraints from 98 to 11 in the 30-bus area, 486 to 19 in the 118-bus, and 966 to 17 in the 300-bus area, indicating high communication efficiency in practice.