[Paper Review] Curtail Renewables to Enhance Flexibility: A Regulated Forecast-based Dispatch Approach

Zhiyi Zhao, Ye Guo|arXiv (Cornell University)|Feb 28, 2026
Electric Power System OptimizationEngineering0 citations
TL;DR

The paper shows that high flexible ramping product (FRP) requirements under forecast-based dispatch (FBD) constrain real-time flexibility and raise costs, and proposes Regulated Forecast-based Dispatch (RFBD) with curtailment caps to reduce FRP needs and operating costs.

ABSTRACT

This paper considers the flexibility degradation problem caused by excessive flexible ramping product (FRP) requirements with high variable energy resource (VER) penetration}. Based on the rolling-window co-optimization model of energy and FRP, theoretical analysis of this paper reveals a unit dispatch transfer effect, in which high FRP requirements under forecast-based dispatch (FBD) constrain real-time flexibility and distort economic efficiency. To alleviate this effect, a regulated forecast-based dispatch (RFBD) approach is proposed, which moderately caps VER outputs and enhances system flexibility. Simulation results demonstrate that the proposed approach effectively lowers FRP requirements and reduces operating cost compared with FBD.

Motivation & Objective

  • Motivate and quantify how excessive FRP requirements under forecast-based dispatch affect system flexibility and economic efficiency with high VER penetration.
  • Develop a regulated forecast-based dispatch (RFBD) framework that caps VER outputs to reduce FRP needs and improve cross-feeding among renewables.
  • Theoretically analyze unit dispatch transfer dynamics under FRP constraints and demonstrate potential cost/emission benefits of RFBD.

Proposed method

  • Formulate a rolling-window co-optimization model for energy and FRP within a multi-interval dispatch framework similar to CAISO’s design.
  • Derive FRP requirements using a Mosaic Quantile Regression (MQR) approach based on historical forecast errors.
  • Analyze unit dispatch transfer under FRP, showing how high FRP can force costlier redispatch across units.
  • Introduce RFBD by capping VER forecasts in advisory intervals and applying a cap-based cross-feeding mechanism.
  • Define how binding interval forecasts are treated (perfect) while advisory interval forecasts are capped to reduce FRP needs.
  • Compare four dispatch modes (FBD and three cap-based RFBD variants) through case studies to assess cost and emissions impacts.

Experimental results

Research questions

  • RQ1How do FRP requirements under forecast-based dispatch affect real-time flexibility and total operating cost in high VER scenarios?
  • RQ2Can a regulated forecast-based dispatch (RFBD) with caps on VER outputs reduce FRP requirements and enable more cost-effective cross-feeding among renewables?
  • RQ3What are the cost and emissions implications of RFBD compared to standard FBD under different VER curtailment levels?

Key findings

  • High FRP requirements under FBD constrain real-time flexibility and can lead to suboptimal generator dispatch.
  • RFBD eliminates FRD requirements and reduces FRU requirements in proportion to VER curtailment caps.
  • RFBD enables cross-feeding among VER units, allowing renewables to partially offset each other’s variability, reducing operating costs.
  • In the two-unit, two-interval case, cap-based RFBD changes the binding interval dispatch minimally while lowering future FRP needs and overall cost.
  • Cap-Δ=0 (eliminating FRD) yields the same binding-interval dispatch as FBD but with zero FRD pricing and lower future costs in the scenario.
  • RFBD generally lowers total two-interval cost and can reduce emissions relative to FBD, with larger caps further reducing FRU requirements and emissions in the reported scenarios.

Read this paper