[Paper Review] MuCol Milestone Report No. 5: Preliminary Parameters

C. Accettura, Antoine Chancé|arXiv (Cornell University)|Jan 1, 2024
Particle Detector Development and PerformancePhysics and Astronomy8 citations
TL;DR

This milestone report presents updated preliminary parameters for a 10 TeV centre-of-mass muon collider design, focusing on key subsystems with high technical uncertainty and cost impact—particularly the cooling channel, transfer tunnel, and beam preparation systems. It reports simulated cooling performance of 1.44 mm in transverse emittance and 3.58 mm in longitudinal emittance over a 48 m cooling channel, with optimized parameters for CERN and Fermilab site-based designs using existing infrastructure.

ABSTRACT

MuCol Milestone 5 - WP1 - Preliminary parameters.

Motivation & Objective

  • To establish updated, technically feasible preliminary parameters for a 10 TeV muon collider complex under the Horizon Europe framework.
  • To reduce technical uncertainty and improve cost and power consumption estimates for high-impact subsystems such as the cooling channel and transfer tunnel.
  • To evaluate the feasibility of using existing CERN and Fermilab infrastructure (SPS and LHC tunnels) for the muon collider's main ring chain (RCS).
  • To support the transition from tentative to preliminary design through collaborative data collection and simulation-based optimization.
  • To inform future cost, power, and performance projections for the MuCol project’s full-scale design phase.

Proposed method

  • Updated parameters were compiled from a collaborative spreadsheet and migrated into Overleaf for version-controlled documentation.
  • Simulations of the pion decay cooling channel (TT7) were performed for 32 m and 48 m lengths, evaluating emittance reduction over multiple cooling cells.
  • The cooling channel design uses 40–60 cells grouped into 8–12 vacuum vessel modules, with peak solenoid fields of 0.5 T and dipole fields of 0.67 T.
  • Site-based RCS layouts were modeled at CERN and Fermilab using existing tunnel geometries, with beam dynamics and RF systems optimized for injection and extraction energies.
  • RF system parameters were derived based on beam loading compensation, cavity detuning, and duty factor calculations, with klystron and cryomodule counts estimated per ring.
  • Survival rates were applied per ring to model muon loss over the acceleration chain, with total survival rates adjusted to achieve target extraction energies.

Experimental results

Research questions

  • RQ1What are the optimal preliminary parameters for the muon collider’s cooling channel, transfer tunnel, and beam preparation systems to minimize cost and power consumption?
  • RQ2How does cooling performance scale with length in a pion decay cooling channel, and what emittance reduction can be achieved over 48 m?
  • RQ3To what extent can existing CERN and Fermilab infrastructure support a 10 TeV muon collider through reuse of SPS and LHC tunnels?
  • RQ4What RF system parameters (voltage, gradient, duty factor, klystron count) are required to achieve stable acceleration across multi-turn RCS chains?
  • RQ5How do beam parameters (emittance, bunch population, current) evolve across the RCS chain under realistic survival and loss assumptions?

Key findings

  • Over a 48 m pion decay cooling channel, transverse emittance was reduced from 2.37 mm to 1.44 mm, and longitudinal emittance from 4.99 mm to 3.58 mm.
  • The cooling channel achieved a 6.5% reduction in 6D emittance (from 26.21 mm³ to 7.12 mm³) over 48 m, indicating strong cooling performance.
  • At CERN, the hybrid RCS chain using SPS and LHC tunnels achieved a total survival rate of 70% with an extraction energy of 3.8 TeV.
  • At Fermilab, the RCS chain achieved a total survival rate of 65% with an extraction energy of 4.06 TeV, using a 15.5 km ring with 14 T superconducting dipoles.
  • The RF system for the CERN-based RCS required 520 cryomodules and 213 klystrons, delivering 145.2 GV total RF voltage and 42.28 MW wall plug power.
  • The CERN-based design achieved a 2.71% RF duty factor, with an average wall plug power of 4.48 MW per RF system, supporting 5 Hz repetition rate and 3.68 mA beam current.

Read this paper

Open the full text in the Nubint reader and ask about any passage as you read.

Read this paper on Nubint