[Paper Review] Resilient Unit Commitment for Day-ahead Market Considering Probabilistic Impacts of Hurricanes

Tianyang Zhao, Huajun Zhang|arXiv (Cornell University)|Nov 18, 2019
Electric Power System OptimizationEngineering7 citations
TL;DR

This paper proposes a two-stage robust optimization framework for resilient day-ahead unit commitment under hurricane threats, integrating time-varying transmission line failure probabilities and repair dynamics via a chance-constrained robust uncertainty set. The method reduces conservatism in uncertainty sets, detects worst-case line failure scenarios, and improves system resilience by enabling proactive scheduling with load shedding and generation curtailment as recourse actions, validated on IEEE-24 and two-area RTS-1996 systems with measurable cost and reliability improvements.

ABSTRACT

In the face of extreme events, e.g., hurricanes, the transmission systems, especially the transmission lines, are affected across time and space. To mitigate these impacts on the day-ahead market from a probabilistic perspective, a resilient unit commitment (UC) problem is formulated as a two-stage robust optimization (RO) problem. In the first stage, the status, energy, and reserves of generators are pre-scheduled to minimize the operational cost, responding to the worst line failure scenario in the operating day. The failure, operation status, and repair of transmission lines are depicted by a novel robust uncertainty set with chance constraint considering the repair of failed lines. This chance constraint is reformulated to its deterministic equivalence. Using both load shedding and generation curtailment, a recourse problem is formulated in the second stage considering the time-varying transmission lines operation status. The formulated RO problem is solved using a column-and-constraint generation scheme. Simulations are conducted on IEEE-24 and two-area IEEE reliability test system-1996 under hurricanes and results verify the effectiveness of the proposed method on the conservation of uncertainty set, worst-case line failure scenario detection and repair preparedness.

Motivation & Objective

  • To address the challenge of probabilistic, time-varying transmission line failures caused by hurricanes in day-ahead market scheduling.
  • To enhance system resilience by incorporating line repair dynamics and failure probabilities into unit commitment decisions.
  • To reduce the conservatism of traditional robust optimization by modeling failure probabilities with time-varying parameters.
  • To detect the worst-case line failure scenarios under given failure probability thresholds.
  • To provide actionable guidance for generators and tie-line operators in interconnected systems under extreme weather conditions.

Proposed method

  • Formulates a two-stage robust optimization problem where the first stage pre-schedules generator commitment, energy, and reserves under the worst-case line failure scenario.
  • Develops a novel robust uncertainty set that integrates time-varying failure probabilities of transmission lines based on hurricane-induced wind and rainfall parameters.
  • Incorporates line repair processes into the uncertainty set using binary variables for failure and repair status, with repair durations modeled as fixed parameters.
  • Applies chance constraints to limit the probability of line failures beyond a threshold, reformulated into deterministic equivalents for tractable solution.
  • Solves the resulting mixed-integer second-order cone program using the column-and-constraint generation (C&CG) algorithm to handle the bilevel structure.
  • Uses Bernoulli-distributed random variables to model line failure status, with failure probabilities derived from meteorological parameters such as wind speed and rainfall rate.

Experimental results

Research questions

  • RQ1How can the uncertainty of hurricane-induced transmission line failures be modeled in a way that captures temporal and spatial variability in failure probabilities?
  • RQ2To what extent does incorporating repair dynamics into the uncertainty set reduce the conservatism of traditional robust optimization in unit commitment?
  • RQ3What is the worst-case line failure scenario under a given failure probability threshold, and how can it be systematically detected?
  • RQ4How does the inclusion of repair times affect operational costs and load shedding in resilient unit commitment?
  • RQ5How do interconnected systems respond to hurricane impacts, and what role do tie-line flows play in resilience?

Key findings

  • The proposed uncertainty set reduces conservatism compared to traditional robust methods, as shown by lower first-stage operational costs under equivalent failure scenarios.
  • With K=7, the system incurs 17.41 MWh of generation curtailment due to islanding, indicating that multiple line failures can lead to black-start challenges.
  • Load shedding increases from 17.81 MWh (K=2) to 43.08 MWh (K=7), but not linearly, indicating non-monotonic system stress under increasing failure counts.
  • The two-area IEEE RTS-1996 system shows lower operational cost fluctuations (1.4M–1.4M USD) compared to the IEEE-24 system, indicating higher resilience in interconnected systems.
  • In Scenario III, where line 19 is repaired by 23:00, load shedding at bus 14 is eliminated, demonstrating the effectiveness of repair planning in restoring system adequacy.
  • The worst-case failure scenario detection successfully identifies critical lines such as line 19 and 23, which trigger cascading load shedding when failed consecutively.

Read this paper

Open the full text in the Nubint reader and ask about any passage as you read.

Read this paper on Nubint

This review was generated by AI from the original paper. Please check the paper before citing it.