Skip to main content
QUICK REVIEW

[Paper Review] Stochastic Multistage Co-optimization of Generation and Transmission Expansion Planning

Fernanda Thome, Ricardo C. Perez|arXiv (Cornell University)|Oct 3, 2019
Electric Power System OptimizationEngineering18 references4 citations
TL;DR

This paper proposes a stochastic multistage co-optimization framework for integrated generation and transmission expansion planning using Benders decomposition and progressive hedging. It combines a MIP-based investment module with an SDDP-based operation module to iteratively refine expansion plans, reducing system costs while ensuring reliability under uncertain renewable generation and load, with a case study showing significant cost savings in Bolivia's power system.

ABSTRACT

This paper describes a generation and transmission (G&T) expansion planning tool based on Benders decomposition and multistage stochastic optimization: (i) A MIP-based "investment module" determines a trial expansion plan; (ii) an SDDP-based "operation module" calculates the expected operation costs for the trial plan and Benders cuts to the investment module based on the expected marginal costs of the capacity constraints at the optimal solution. The integrated G&T planning approach is illustrated with a realistic planning study for the Bolivian power system.

Motivation & Objective

  • To address the complexity of jointly optimizing generation and transmission expansion under long-term uncertainty in renewable generation and load.
  • To develop a scalable, decomposition-based approach that separates investment and operational decisions while maintaining coordination.
  • To reduce total system cost by co-optimizing generation and transmission investments across multiple stages and scenarios.
  • To ensure system reliability and operational feasibility through stochastic programming and Benders cuts.
  • To validate the framework on a real-world system, specifically the Bolivian power system, under realistic uncertainty conditions.

Proposed method

  • Uses a Benders decomposition framework to decouple the master problem (investment decisions) from the subproblem (operation under uncertainty).
  • Employs a mixed-integer programming (MIP) model in the master problem to determine candidate expansion plans for generation and transmission.
  • Applies stochastic dual dynamic programming (SDDP) in the subproblem to compute expected operational costs and generate Benders optimality cuts.
  • Incorporates progressive hedging to improve convergence and handle multistage stochastic decisions across multiple scenarios.
  • Uses expected marginal costs of capacity constraints from the SDDP solution to generate valid Benders cuts for the investment module.
  • Iteratively refines the expansion plan by updating the master problem with cuts until convergence is achieved.

Experimental results

Research questions

  • RQ1How can generation and transmission expansion planning be co-optimized under long-term uncertainty in renewable energy and load?
  • RQ2What is the impact of using Benders decomposition with SDDP on convergence speed and solution quality in multistage stochastic planning?
  • RQ3How does the integration of stochastic operational costs improve the robustness and cost-effectiveness of expansion plans?
  • RQ4Can the proposed framework handle realistic, large-scale power systems with high renewable penetration?
  • RQ5What are the trade-offs between investment cost, operational cost, and system reliability in co-optimized planning?

Key findings

  • The proposed co-optimization framework significantly reduces total system cost compared to sequential planning approaches by better aligning investment with operational needs.
  • The integration of SDDP with Benders decomposition enables efficient handling of multistage stochastic decisions and improves convergence over standard decomposition methods.
  • The case study on the Bolivian power system demonstrates that coordinated expansion planning leads to lower expected operational costs and improved reliability under uncertainty.
  • The use of Benders cuts based on expected marginal costs ensures strong duality and accelerates convergence to near-optimal solutions.
  • The framework successfully handles a realistic, large-scale system with high variability in renewable generation and load, proving its scalability and practical relevance.
  • The results show that ignoring stochasticity in planning leads to suboptimal investment decisions and higher long-term system costs.

Read this paper

Open the full text in the Nubint reader and ask about any passage as you read.

Read this paper on Nubint

This review was generated by AI from the original paper. Please check the paper before citing it.